Laserfiche WebLink
I <br /> Page 5 <br /> SITE PREPARATION AND SYSTEM DATA <br /> THREE-TANK SYSTEM <br /> CUSTOMS !�rlC - DATE: <br /> dLOCATION O.: � SYSTEM NO.: _ <br /> CITY/STATE <br /> PRODUCT:* �7- <br /> �, <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY I❑ PPSUGS ❑ RISERS �_�Q OTHER - <br /> VENT L-I ISO PREPARATION IJ OPEN TO ATMOSPHERE ❑ P-V VALUE REMOVED ❑ OTHER <br /> REMOTE/SUBMERSIBLE (DEPTH I ❑ SUCTION (HEIGHT I <br /> CHECK VALVE STRAINER I-I,.I�MPACT VALVE CHECK VALVE STRAINER SUCTION CONNECTION <br /> ❑REMOVED&OPEN DRREEMOVED LDpCUGEN ❑BURIED E❑' REMOVED ❑UNION <br /> El IN <br /> PLACE 2IN PACE ❑PLUG OUT LOSED ❑EXTRACTABLE L..I IN PLACE ❑COUPLING <br /> UCLOSED ❑REMOVED&COVER 1:1 OPEN ❑REMOVED ❑REP q Ep&COVER ❑OPEN WITH FOIL <br /> ❑REMOVED&COVER ❑OTHER ❑IN PLACE ❑OTHER El OPEN NO FOIL <br /> REPLACED <br /> ❑CAP REMREP ACED El IN PLACE <br /> ❑OTHER <br /> ❑OTHER ❑OTHER - <br /> c <br /> TEST 1 DATA - <br /> u <br /> TANK 1 TANK 2 TANK 3 <br /> LOCATION DROPTUBE LOCATION DROPTUBE LOCATION DROPTUBE <br /> FILL Gauge Other(Specify) IN OUT None FILL Gau Omer(Specify) IN OUT Nont FILL Gauge Other(Specify) IN OUT None <br /> T.PROBE <br /> BALANCE <br /> CALIBRATION _ <br /> LEVELS LOCATION 14_�C Ll METHOD I�SOLID ROD <br /> ❑ LIQUID <br /> Time Tank 1 Tank 2 Tank 3 1 2 3 4 5 6 AVERAGE <br /> STARTCe CC'S 71 = <br /> END A DIVISION <br /> AVG.CC'S/DIV. r , <br /> LEAK RAT LR CALCULATION c <br /> LR= fADIVISIONS X CALIBRATION, CC = CC IN OUT <br /> MINUTE DIVISION MINUTE <br /> LR <br /> TEMPERATURE COMPENSATION (TC)CALCULATION '3 <br /> COEFFICIENT OF EXPANSION 1/*F <br /> TC _ 3785 GT CE �.F CG IN OUT <br /> GRAVITY TEMPERATURE,�F - OR - <br /> 0 TIME MINUTE <br /> SOURCE ❑'T758C "- ' - <br /> Cl A ❑ D ❑ CHART C't• <br /> ❑ B ❑ E O PUBLISHED DATA AT60 F hy-r- n-• +;,v - <br /> o <br /> ❑ C ❑ OTHER TC = <br /> TANK1 TANK2 - <br /> SYSTEM CAPACITY,GALLONS ^ >O fJ GT TANK 3 TANK 2 TANK 3 TOTAL <br /> OOF A*F <br /> f Temp. Differential - •J Ji( TC- <br /> Temp. <br /> T Time of Tamp. -� OTime <br /> Differential, Min. <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE f, 7f� - k JIr- U� <br /> LEAK RATE TEMP.COMPENSATION = CCC/MIN <br /> = X 0.025652• _ �' 6 <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR 1 t 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> "60 MINUTES/HOUR - 3785 CC/GALLON a o.Oleeea <br />