My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1313
>
2300 - Underground Storage Tank Program
>
PR0231049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 7:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231049
PE
2381
FACILITY_ID
FA0003765
FACILITY_NAME
AIRPORT SHELL*
STREET_NUMBER
1313
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137007
CURRENT_STATUS
02
SITE_LOCATION
1313 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CHARTER\1313\PR0231049\COMPLIANCE INFO 1986 - 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Page 5 <br /> SITE PREPARATION AND SYSTEM DATA <br /> THREE-TANK SYSTEM <br /> CUSTOMS !�rlC - DATE: <br /> dLOCATION O.: � SYSTEM NO.: _ <br /> CITY/STATE <br /> PRODUCT:* �7- <br /> �, <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY I❑ PPSUGS ❑ RISERS �_�Q OTHER - <br /> VENT L-I ISO PREPARATION IJ OPEN TO ATMOSPHERE ❑ P-V VALUE REMOVED ❑ OTHER <br /> REMOTE/SUBMERSIBLE (DEPTH I ❑ SUCTION (HEIGHT I <br /> CHECK VALVE STRAINER I-I,.I�MPACT VALVE CHECK VALVE STRAINER SUCTION CONNECTION <br /> ❑REMOVED&OPEN DRREEMOVED LDpCUGEN ❑BURIED E❑' REMOVED ❑UNION <br /> El IN <br /> PLACE 2IN PACE ❑PLUG OUT LOSED ❑EXTRACTABLE L..I IN PLACE ❑COUPLING <br /> UCLOSED ❑REMOVED&COVER 1:1 OPEN ❑REMOVED ❑REP q Ep&COVER ❑OPEN WITH FOIL <br /> ❑REMOVED&COVER ❑OTHER ❑IN PLACE ❑OTHER El OPEN NO FOIL <br /> REPLACED <br /> ❑CAP REMREP ACED El IN PLACE <br /> ❑OTHER <br /> ❑OTHER ❑OTHER - <br /> c <br /> TEST 1 DATA - <br /> u <br /> TANK 1 TANK 2 TANK 3 <br /> LOCATION DROPTUBE LOCATION DROPTUBE LOCATION DROPTUBE <br /> FILL Gauge Other(Specify) IN OUT None FILL Gau Omer(Specify) IN OUT Nont FILL Gauge Other(Specify) IN OUT None <br /> T.PROBE <br /> BALANCE <br /> CALIBRATION _ <br /> LEVELS LOCATION 14_�C Ll METHOD I�SOLID ROD <br /> ❑ LIQUID <br /> Time Tank 1 Tank 2 Tank 3 1 2 3 4 5 6 AVERAGE <br /> STARTCe CC'S 71 = <br /> END A DIVISION <br /> AVG.CC'S/DIV. r , <br /> LEAK RAT LR CALCULATION c <br /> LR= fADIVISIONS X CALIBRATION, CC = CC IN OUT <br /> MINUTE DIVISION MINUTE <br /> LR <br /> TEMPERATURE COMPENSATION (TC)CALCULATION '3 <br /> COEFFICIENT OF EXPANSION 1/*F <br /> TC _ 3785 GT CE �.F CG IN OUT <br /> GRAVITY TEMPERATURE,�F - OR - <br /> 0 TIME MINUTE <br /> SOURCE ❑'T758C "- ' - <br /> Cl A ❑ D ❑ CHART C't• <br /> ❑ B ❑ E O PUBLISHED DATA AT60 F hy-r- n-• +;,v - <br /> o <br /> ❑ C ❑ OTHER TC = <br /> TANK1 TANK2 - <br /> SYSTEM CAPACITY,GALLONS ^ >O fJ GT TANK 3 TANK 2 TANK 3 TOTAL <br /> OOF A*F <br /> f Temp. Differential - •J Ji( TC- <br /> Temp. <br /> T Time of Tamp. -� OTime <br /> Differential, Min. <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE f, 7f� - k JIr- U� <br /> LEAK RATE TEMP.COMPENSATION = CCC/MIN <br /> = X 0.025652• _ �' 6 <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR 1 t 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> "60 MINUTES/HOUR - 3785 CC/GALLON a o.Oleeea <br />
The URL can be used to link to this page
Your browser does not support the video tag.