My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1313
>
2300 - Underground Storage Tank Program
>
PR0231049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/2/2018 7:03:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231049
PE
2381
FACILITY_ID
FA0003765
FACILITY_NAME
AIRPORT SHELL*
STREET_NUMBER
1313
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137007
CURRENT_STATUS
02
SITE_LOCATION
1313 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CHARTER\1313\PR0231049\COMPLIANCE INFO 1986 - 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VED <br /> SHELL LLESPONSE PLAN ./,,0, REC I <br /> SEP 2 4 1992 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> INTRODUCTION <br /> IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES <br /> FOR USE BY THE SHELL OIL COMPANY FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH <br /> MAY OCCUR AT SHELL FACILITIES. DESIGN AND INSTALLATION IMPROVEMENTS ARE <br /> CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER TO REDUCE, AND ELIMINATE, <br /> THE POTENTIAL FOR PRODUCT LEAKAGE_ <br /> RESPONSIBLE SHELL PERSONNEL <br /> NAME TITLE PIiONE <br /> Stan Roller District Engineer (510) 675-6145 <br /> (Home) (510) 449-9291 <br /> Dan Kirk Environmental Engineer (5L0) 675-6168 <br /> (Home) (510) 945-8573 <br /> RESPONSIBLE CONTRACTOR ' <br /> GETTLER - RYAN, INC. 415/783-7500 24 HOURS <br /> 2150 WEST WINTON <br /> HAYWARD, CA 94545 <br /> LEAK VERIFICATION <br /> WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING <br /> LEAK VERIFICATION PROCEDURES WILL APPLY: <br /> 1. THE SHELL ENGINEER WILL ARRANGE FOR THE SHELL TERRITORY 14ANAGER TO <br /> IMMEDIATELY (THE SAME DAY) VISIT THE STATION TO REVIEW THE DEALER' S <br /> PHYSICAL CONTROL OF PRODUCTS AND INVENTORY RECORDS. <br /> 2 . AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION , <br /> ASSURE METERS ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, <br /> AND CHECK LEAK DETECTOR OPERATION (ON REMOTE SYSTEMS) . <br /> 3 - ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS <br /> A RECORD OF SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br /> 4 . IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER <br /> SHOULD IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B) , WHICH WOULD <br /> BE MAINTAINED FOR A MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, <br /> FOR SUBSTANTIATION OF A SUSPECTED LEAK. DEPENDING ON THE CIRCUMSTANCES <br /> (POTENTIAL HAZARDOUS CONDITION, ETC. ) , IT MAY BE NECESSARY TO TAKE <br /> ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.