My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />D. Results of Testing/Servicing <br />Software Version Installed: 327.04 <br />Complete the following checklist: <br />• RECEIVED <br />FEB 2 2 2016 <br />ENVIRONMENTAL <br />HFA! TN nrPARTMcMT <br />Yes <br />r No- <br />Is the audible alarm operational? <br />s Yes <br />r No* <br />Is the visual alarm operational? <br />+' Yes <br />r No* <br />Were all sensors visually inspected, <br />functionally tested, and confirmed operational? <br />T Yes <br />(' No* <br />Were all sensors installed at lowest <br />point of secondary containment and positioned so that other equipment will not Interfere wig <br />heir proper operation? <br />it Yes <br />r No* <br />If alarms are relayed to a remote m <br />oni station, is all communications equipment (e.g. modem) operational? <br />r N/A <br />Yes <br />r No` <br />For pressurized piping systems, do <br />s the turbine automatically shut down If the piping secondary containment monitoring <br />r <br />stem detects a leak, fails to operate, <br />or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check <br />N/A <br />all that apply Sump/French Sen <br />ors; F-0 Dispenser Containment Sensors. <br />Did you conf rm positive shut -down <br />due to leaks and sensor failure/disconnection?(+ Yes; r No <br />To Yes <br />r No* <br />For tank systems that utilize the mc <br />mitering system as the primary tank overfill warning device (i.e. no mechanical overrill <br />r <br />Prevention valve is Installed), is the <br />overfill warning alarm visible and audible at the tank fill points) and operating properly? If <br />N/A <br />ISO at what percent of tank capacity <br />does the alarm trigger? 90% <br />P Yes- <br />(' No <br />Nas any monitoring equipment rep <br />aced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for <br />II replacement parts in Section E below. <br />Yes* <br />( No <br />asliquid found inside any second <br />ry containment systems designed as dry systems? (Check all that apply) <br />._ Product• ❑ Water. If es de <br />ribe causes in Section E below. <br />IT Yes <br />r No` <br />Was monitoring system set-up revi <br />wed to ensure proper settings? Attach set up reports, if applicable <br />-•' Yes <br />r No` <br />[s all monitoring equipment operati <br />nal per manufacturers specifications? <br />
The URL can be used to link to this page
Your browser does not support the video tag.