My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.'-7A <br />has successfully completed Bonder Training t forth in the <br />Fiber Glass Systems° Total Quality Installation Program for the . <br />installation of UL listed primary and secondary containment <br />products. ' <br />Date ` <br />Renewal of the bonder certification is recommended every three years <br />or when the specific bonding process has not been practiccd for a <br />period of six months. <br />Fib re 0QIsz S (0- M <br />has successfully coinpleted Bonder T&Ining as set forth in the <br />Fiber Glass Systems' Total Quality Installation Program for the <br />installation of UL fisted primary and secondary containment <br />products. i <br />/ <br />Date <br />Renewal of the bonder certification is recommended every three years <br />or when the specifrc bonding process has not been practiced for a <br />period of six months. <br />('UA t7a � Ue i <br />has successfully completed Bonded ming as set forth in the <br />Fiber Glass Systems' TotaI Quality Installation Program for the t <br />installation of UL listed primary and secondary containment <br />products. <br />Date <br />Renewal of the bonder certification is recommended every three years 1 <br />or when the specific bonding process has not been practiced for a <br />period of six months. ' i �- <br />
The URL can be used to link to this page
Your browser does not support the video tag.