Laserfiche WebLink
0 0 <br />Chevron Monitoring Certification Chec list <br />F7 C44 <br />1VP <br />Store Number: 210997 <br />Address: 1442A COLONY D.. RIPON, CA 95366 <br />Date: 1/21/2016 <br />Technician: Jarrod Cooke <br />Company: TANKNOLOGY INC. <br />T, <br />Step <br />Instruction <br />Tank 1 -PREMIUM <br />Tank 2 -REGULAR <br />H <br />!AMA rtGPART <br />N <br />Product <br />PREMIUM <br />REGULAR <br />Tank Type <br />Fiberglass <br />Fiberglass <br />(DW FRP, DW Steel, SW FRP) <br />1 <br />Annular Riser Height (measured) <br />63.00 in. <br />64.00 in. <br />2 <br />Tank Diameter <br />0.00 in. <br />0.00 in. <br />3 <br />For FRP tanks, 1/2 circumference of thetank <br />0.00 in, <br />0.00 in. <br />(see Note 1 below) <br />Required annular sensor length: <br />4 <br />FRP = Riser + 112 Circumference = step l+step 3 <br />63.00 in. <br />64.00 in. <br />Steel= Riser + diameter = step 1 +step 2 <br />Mark & label the required sensor length on sensor cord. <br />5 <br />Label should be under the cap & serve to prevent the cc <br />d <br />Yes <br />Yes <br />being pulled too short. <br />FRP Tanks: Is the sensor installed with the marked <br />6 <br />required <br />Yes <br />Yes <br />length lining up with the top of the annular riser? <br />Steel Tanks: Is the sensor toughing bottom with slack <br />7 <br />above the marked required sensor length? <br />Are the DW pipe boots pulled back in tank sumps? <br />8 <br />(YIN or N/A, note if can't be verified because clamshell <br />Yes <br />Yes <br />pointing down <br />Are tank sump sensors back in their holders and in the <br />9 <br />correct position? <br />Yes <br />Yes <br />(YIN or N/A document with photo) <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />Replaced Today <br />ba <br />(If battery backup failed, label and leave failed ttery on top of co <br />sole, note in comments and advise your OM) <br />Has Veeder Root Programming before & after testing been printed <br />& verified? <br />Yes <br />(especially tank manifolding setup -see Nate 2) <br />Has Veeder Root Programming before & after been attached to th <br />2 Work Order? <br />Yes <br />Have all sensor model numbers been verified against the Veeder <br />Root cord label? <br />Yes <br />Make a nate if sensor label missing orillegible, & approx. card len <br />h far -208/-209 with missing labels <br />Additional Comments: <br />Note 1: <br />Note2: Certain Veeder Root Software versions will automatically revert to the default <br />DW FRP Tank Circumference <br />tank manifold settings any time the programming is changed, such as when sensors are <br />(3.14 x tank diam) <br />temporarily X'ed out, etc. <br />1/2 Circum = <br />2 <br />10' diameter 1/2 Circum =188" <br />8' diameter 1/2 Circum =151" <br />6' diameter 1/2 Circum =113" <br />AL <br />T <br />