My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer <br />Industry Standard <br />Other (Sped) <br />Test Method Used: Z Pressure <br />E] Vacuum <br />❑ Other (Spec) <br />Test Equipment Used: See attach d t <br />Page 3 of 9 <br />[I Professional Engineer <br />0 Hydrostatic <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (R,): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Clam Shell in sump <br />Premium <br />Clam Shell in sump <br />13 <br />87 Vent <br />Test boot in sump <br />Piping Run #91 Vent <br />Fiberglass <br />Smith <br />311 <br />I5' <br />41 Vent <br />Test boot in sump <br />30 minutes <br />e estmg procedures <br />Equipi ent Resolution: <br />I <br />Piping Run # 87 <br />30 minutes <br />8:20am <br />Piping Rnn # 41 <br />Piping Run #87 <br />Piping Material: <br />Fiberglass <br />Fiberglass g <br />Vent <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />31a <br />219 <br />Length of Piping Run: <br />150' <br />150' <br />, <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (R,): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Clam Shell in sump <br />Premium <br />Clam Shell in sump <br />13 <br />87 Vent <br />Test boot in sump <br />Piping Run #91 Vent <br />Fiberglass <br />Smith <br />311 <br />I5' <br />41 Vent <br />Test boot in sump <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />8:20am <br />Visual Fail <br />9:20am <br />8:20am <br />5 psi <br />5 psi <br />5 psi <br />9:20am <br />9:20am <br />9:20am <br />5 psi <br />5 psi <br />5 psi <br />1 hour <br />I hour <br />1 hour <br />1 hour <br />a <br />� <br />� <br />0.00 <br />0.00 <br />OAO <br />0.00 <br />Pass 0 Fail <br />[] Pass ® Fail <br />Pass El Fail <br />Pass ❑Fail <br />CommentS — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 prod sec line —would not build up any back pressure —found leak at clam shell 3x2 Smith <br />
The URL can be used to link to this page
Your browser does not support the video tag.