Laserfiche WebLink
2. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer <br />Industry Standard <br />Other (Sped) <br />Test Method Used: Z Pressure <br />E] Vacuum <br />❑ Other (Spec) <br />Test Equipment Used: See attach d t <br />Page 3 of 9 <br />[I Professional Engineer <br />0 Hydrostatic <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (R,): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Clam Shell in sump <br />Premium <br />Clam Shell in sump <br />13 <br />87 Vent <br />Test boot in sump <br />Piping Run #91 Vent <br />Fiberglass <br />Smith <br />311 <br />I5' <br />41 Vent <br />Test boot in sump <br />30 minutes <br />e estmg procedures <br />Equipi ent Resolution: <br />I <br />Piping Run # 87 <br />30 minutes <br />8:20am <br />Piping Rnn # 41 <br />Piping Run #87 <br />Piping Material: <br />Fiberglass <br />Fiberglass g <br />Vent <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />31a <br />219 <br />Length of Piping Run: <br />150' <br />150' <br />, <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />Pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (R,): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Clam Shell in sump <br />Premium <br />Clam Shell in sump <br />13 <br />87 Vent <br />Test boot in sump <br />Piping Run #91 Vent <br />Fiberglass <br />Smith <br />311 <br />I5' <br />41 Vent <br />Test boot in sump <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />8:20am <br />Visual Fail <br />9:20am <br />8:20am <br />5 psi <br />5 psi <br />5 psi <br />9:20am <br />9:20am <br />9:20am <br />5 psi <br />5 psi <br />5 psi <br />1 hour <br />I hour <br />1 hour <br />1 hour <br />a <br />� <br />� <br />0.00 <br />0.00 <br />OAO <br />0.00 <br />Pass 0 Fail <br />[] Pass ® Fail <br />Pass El Fail <br />Pass ❑Fail <br />CommentS — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 prod sec line —would not build up any back pressure —found leak at clam shell 3x2 Smith <br />