Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br />r Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Yes <br />f No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />'t Yes <br />r No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />is Yes <br />r No* <br />Was accuracy of system product level readings tested? <br />i+ Yes <br />(' No* <br />Was accuracy of system water level readings tested? <br />Yes <br />r No* <br />Were all probes reinstalled properly? <br />is Yes <br />Ir No* <br />1were all items on the equipment manufacturer?s maintenance checklist completed? <br />in the Section n, below, describe how and when these deticiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />i No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that <br />N/A <br />apply) Simulated leak rate: r 3 g.p.h.; r 0.1 g.p.h; r 0.2 g.p.h. <br />l+ Yes' <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />f+' Yes <br />f No* <br />Was the testing apparatus properly calibrated? <br />f' Yes <br />(` No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />f No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />t N/A <br />fe Yes <br /># No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />N/A <br />i. Yes <br />C' No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />l' N/A <br />i Yes <br />r No* lWere <br />all items on the equipment manufacturer's maintenance checklist completed? <br />in the Section M, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 12/07 <br />