Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />P, 1ftnSC77C21CW <br />TEST DATE: 02/07/11 <br />8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER: <br />AUSTIN, TEXAS 78759 (512) 451-6334 <br />2279400 <br />CLIENT: CHEVRON PRODUCTS <br />SITE: CHEVRON 210997 <br />(N-4693) <br />TANK INFORMATION <br />Tank ID: REGULAR 2 <br />Tank manifolded: NO Bottom to top fill in inches: <br />184.0 <br />Product: UNLEADED <br />Vent manifolded: YES Bottom to grade in inches: <br />11.88.0 <br />Capacity in gallons: 19,703 Vapor recovery manifolded: YES Fill pipe length in inches: <br />66.0 <br />Diameter in inches: 118.00 <br />Overfill protection: YES Fill pipe diameter in inches: <br />4.0 <br />Length in inches: 420 <br />Overspill protection: YES Stage I vapor recovery: <br />DUAL <br />Material: DW FIBERG <br />Installed: ATG Stage II vapor recovery: <br />ASSIST <br />CP installed on: <br />COMMENTS <br />TANK TEST RESULTS Test Method: NONR <br />LEAK DETECTOR TEST RESULTS est .method: - <br />r <br />PSI at tank bottom: <br />Newipassed Failedfreplaced New/passed Failedireplaced <br />Fluid level in inches: <br />L.D. #1 L.D. #1 L.D. #2 <br />L.D. #2 <br />UFT/OFT: <br />Make: VEEDERROOT <br />Fluid volume in gallons: <br />Model: ELECTRONIC <br />Tank water level in inches: <br />SIN: 199451 <br />Test time: NOT <br />Open time in sec: <br />Number of thermisters: TESTED <br />Holding psi: 22 <br />NOT <br />Specific gravity: <br />Resiliency cc: <br />TESTED <br />Water table depth in inches: <br />est leak rate ml/m: 189.0 <br />Determined by (method): <br />Metering psi: <br />Leak rate in gph: <br />Calib. leak in gph: 3.00 <br />Result: <br />Results: PASS <br />COMMENTS <br />COMMENTS <br />ULLAGE TEST RESULTSTest Method: NONE <br />LINE TEST RESULTS Test type: TLD -1 <br />Test time: <br />Ullage volume: <br />Material: DW FIBERG TOTAL CONT <br />Ullage pressure: <br />Diameter (in): 2.0 <br />Results: <br />Length (ft): 295.0 <br />Test psi: <br />DATA FOR UTS-4T ONLY: <br />Bleedback cc: <br />Time of test 1: <br />Test time (min): <br />Temperature: NOT <br />Start time: NOT NOT NOT <br />NOT <br />Flow rate (cfh): TESTED <br />End time: TESTED TESTED TESTED <br />TESTED <br />Time of test 2: <br />Final gph: <br />Temperature: <br />Result: <br />Flow rate (cfh): <br />Pump type: PRESSURE <br />Time of test 3: <br />Pump make: FE PETRO <br />Temperature: <br />Flow rate (cfh): <br />Impact Valves Operational: YES <br />COMMENTS <br />COMMENTS <br />Printed 02/1612011 18:26 KOHLMEYER <br />