Laserfiche WebLink
Monitoring System Certification <br />0 <br />Site Address: 1442A COLONY DR. <br />F. In -Tank Gauging 1 SIR Equipment <br />Check this box if no tank gauging or SIR equipment is installed. <br />Date of Testing/Service: 0210712011 <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />IflYes <br />❑No ` <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Ifl Yes <br />F-1 No - <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />©No- <br />Was accuracy of system product level readings tested? <br />FX Yes <br />'FI No • <br />Was accuracy of system water level readings tested? <br />X Yes <br />F]No • <br />Were all probes reinstalled properly? <br />Q Yes <br />I [—]No * <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD) <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />❑Q• <br />Yes <br />[:]No <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: X❑ 3 g.p.h [] 0.1 g.p,h [:]0.2 g.p.h <br />X❑ Yes <br />❑ No • <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />❑No * <br />Was the testing apparatus properly calibrated? <br />FjYes <br />❑ No * <br />® N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Q Yes <br />❑No • <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />Yes <br />❑No • <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />Q Yes <br />❑No ' <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />Yes <br />❑No • <br />❑ NIA <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />[9 Yes <br />❑No • <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section H, below, describe how and when tnese bericienues were or win De correctea. <br />H. Comments: <br />Page 3 of 3 Based on CA form dated 03108 <br />