Laserfiche WebLink
SWRCB, January 2002 <br />ROO JUL 20 2015 <br />Page of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/OverfilI Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard []Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: El Pressure <br />❑✓ Other (Spec) 11 <br />❑ Vacuum ❑Hydrostatic <br />hour visual leak test <br />Test Equipment Used: See attached testing procedures Equipment Resolution: Other <br />Spill Box # 87 Fill Spill Box # 91 FIII Spill Box # 87 Vapor Spill Box # 91 Vapor <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />12" <br />Bucket Depth: <br />12 112 " <br />12 112 " <br />14" <br />14" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 minutes <br />16 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />9:46am <br />9.46am <br />9:46am <br />9:46am <br />Initial Reading (R4): <br />11 314 Other <br />11 1116 Other <br />13 118 Other <br />127/8 Other <br />Test End Time: <br />10.46am <br />10:46am <br />10:46am <br />10:46am <br />Final Reading (RF): <br />11 314 Other <br />11 1116 Other <br />13 118 Other <br />127/8 Other <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />1hr <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />a❑Pass ❑Fail <br />❑Pass ❑Fail <br />❑ Pass ❑Fail <br />21 Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />