My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a • ! <br /> S;ARCB,January 2002 Page_of 4 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING-NONE <br /> 8. FILL RISER CONTAINMENT SUMP TESTING-NONE <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer J Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum J Hydrostatic <br /> Other(Spec=) <br /> W <br /> quipment Used:Incon STS Equipment Resolution:±.0001 <br /> UST Spill Box Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 12" <br /> Bucket Depth: 12" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN <br /> starting test: <br /> Test#1 Test#2 <br /> Test Start Time: 11:17 AM 11:34 AM <br /> Initial Reading(R1): 3.007 3.0072 <br /> Test End Time: 11:32 AM 11:49 AM <br /> Final Reading(RF): 3.0067 3.0073 <br /> Test Duration: 15 MINX 2 <br /> Change in Reading(RF-R,): FO 0003 0.0001 <br /> Pass/Fail Threshold or .002 <br /> Criteria: <br /> est Result: ✓ Pass Fail Pass Fail Pass Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> SPRI14T SPRINT <br /> 3807 CORONADO AVE 3807 CORONADO AVE <br /> STOCXT04 CA STOCXTOH CA <br /> LESMESNAGER ENGINEER LESMESNAGER ENGINEERING <br /> I VIO/2808 11133 AM 11/10/2008 11:49 M <br /> SW LEAK TEST REPORT SVAP LEAK TEST REPORT <br /> SPiL3KT SPILBKT <br /> TEST STARTED 11=17 AN TEST STARTED 11:34 M <br /> TEST STARTED 11/18/2008 TEST STARTED 11/10/2808 <br /> BEGIN LEVEL 3.0670 IN BEGIN LEVEL 3.0072 IN <br /> END TIME 11:32 M END TIME 11149 M <br /> ENO DATE 11/10/20M END DATE 11/18/2808 <br /> END LEVEL 3.0867 IN END LEVEL 3.0073 IN <br /> LEAK THRESHOLD 8.802 IN LEAK THRESHOLD 0.002 IN <br /> TEST RESIAT PASSED TEST RESULT PASSED <br />
The URL can be used to link to this page
Your browser does not support the video tag.