Laserfiche WebLink
SWRCB,January 2002 Page_of 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer ✓Industry Standard Professional Engineer <br /> Franklyn Fueling Systems Other(Specify) <br /> Test Method Used: Pressure Vacuum ✓Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Incon STS quipment Resolution:±.0001 <br /> ,AUST Piping Sump AST Piping Sump Sump# ump# <br /> Sump Diameter: 2" 6"square <br /> Sump Depth: 2" 36"square <br /> Sump Material: FIBERGLASS POLY <br /> Height from Tank Top to Top of 0" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 0" g" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: CLEAN CLEAN <br /> Portion of Sump Tested "ABOVE PIPE "ABOVE PIPE <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product Yes No ✓NA Yes No NA Yes No NA Yes No NA <br /> and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No ✓NA Yes No NA Yes No NA Yes No NA <br /> shutdown?' <br /> Was fail-safe verified to be Yes No ✓NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying 15 MIN <br /> pressure/vacuum/water and starting est#1 Test#2 <br /> est: <br /> Test Start Time: :17 PM :39 PM 12:11 PM 12:27 FMM <br /> Initial Reading`.`1): .4339 .4339 5.3302 5.3300 <br /> Test End Time: :32 PM :54 PM 12:26 PM 12:42 PM <br /> Final Reading(RF): 4.434 4.434 5.3303 .3302 <br /> Test Duration: 15 MINX 2 15 MINX 2 <br /> hange in Reading(RF-RI): .0005 .0005 .0001 .0002 <br /> Pass/Fail Threshold or Criteria: 002 .002 <br /> Test Result: ✓Pass Fail %f Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? ✓Yes No NA ✓Yes No NA Yes No NA Yes No NA <br /> as sensor properly replaced and (Yes No NA -1 Yes No NA Yes No NA Yes No NA <br /> erified functional after testin ? <br /> sPRINT 3807 AVE `SPRINT sTOO:TON "1 AVE COWNFOO d <br /> Laocsw4cm DOlPEERIND LEVT-q*G0L DOINEMlNO LESIESNAGER DOIREERINO LESMESHO"R ENGINEERING <br /> 11/10/2000 3:32 P'1 11/10/2008 3136 PN 11,19/im 12126 PM 121+2 PN <br /> SLAP LEAK TEST REPORT SUW LEAK TEST REPORT SLW LGA( TEST REPORT SLIP lIM TEST REPORT <br /> PIPE I PIPE i PIPE 3:r PIPE °JR <br /> TEST STARTED 3117 PA TEST STARTED 3139 PN TEST STARED TEST STARTED 12127 PN <br /> TEST STARED 11/10/2080 119,2 PA TEST STARTED 11/19/2808 <br /> 4.4539 IN TMST `STARTED 11/10/2008 TEST STARTED 11/19/2088 swim LCIAL 3.330 IN <br /> BEGIN LE0E1. BEGIN l2tEL 4.45',9 1N BEOIN LEtEL 3.3302 IN DO TINE 12142 PN <br /> DO TUE 3132 P71 swim <br /> m U 3134 PN END TIm :2126 PN <br /> oD DATE 11/10/2008 DO DATE II/l9/2M DO DME 11.19/20110 <br /> Dy L 4.4340 IN END DATE 11/10/2008 FIO �� S.STu IN oC LDEL 3.3302 IN <br /> LEAK TI8E9OLD 0.002 IN DO LE1k1. +.+348 IN TEST INERLY D 0.882 IN <br /> TEST RESRLT PASSED LEAK TNRE%o-D 0.002 IN �6 ��T 8•PASPASSED <br /> TEST R[SULT Mu5[D <br /> TEST RE511LT PASSED <br />