Laserfiche WebLink
SWRCB, January 2002 S � Page 2 of 2 <br /> 9 SPILL 1 OVERFILL CONTAINMENT BOXES <br /> ac-ility-is-Not-Equipped-With=Spill/Overfill-Containrnent=BQxes ❑ --- — ---- <br /> ill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: Q Piping Manufacturer Q Industry Standard O Professional Engineer <br /> Q Other(Specify) <br /> 4 <br /> Test Method Used: 0 Pressure O Vacuum Q Hydrostatic <br /> C)Other(Specify) <br /> Test Equipment Used: EBW JEquipment Resolution: +l-0.002 Inches <br /> Spill Bax# Diesei pill Box# Spill Box# pill Bax# <br /> Bucket Diameter: 12" <br /> Bucket Depth: 12" <br /> ait time between applying <br /> P <br /> ressure/vacuum/water and 10 min. <br /> S <br /> tarting test: <br /> est Start Time: 5:08-5:23 <br /> Initial Reading (R,) .8217 -.8220 <br /> Test End Time: 5:23-5:38 <br /> Final Reading(RF) .08220-.08221 <br /> Test Duration: 15 min.115 min. <br /> Change in Reading(RF-R,) .0003-.0001 <br /> Pass/Fail <br /> Threshold or Criteria: +l 0.002 Inches <br /> Dass;' ❑Faul. .. [ Pass ❑Fail ❑;Pass. .❑Fail <br /> eat Result <br /> Wmments-(include information on repairs made prior to testing, and recommended follow-up failed tests) <br /> ............................................................................................................................_.............................................................. <br /> i <br /> ........................................................................................................................................................................................................................................................................... <br />