Laserfiche WebLink
Comments: <br /> Employees trained on 8-28-2007 <br /> Items Requiring Follow-Up Actions: <br /> Monitor and spill bucket certification must be completed as they are past due <br /> * No records for line tightness test have been located. Secondary test was completed on 10-28-05 and line <br /> tightness testing may have been completed at that time. Records should be located or line tightness testing <br /> should be completed. <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator, who <br /> possesses a current"California UST System Operator"certification issued by the International Code <br /> Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator, but <br /> not to the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or, if approved by the <br /> local agency, off-site at a readily available location. <br /> Page 2 of 2 November 2004 <br />