My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shirley Environmental Testing, Corp. -: <br /> Designated Underground Storage Tank(UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name: o c_k -j S > - a We:' t a Co <br /> Facility Address: 3$U o ct.c, <br /> city-, c k c7 r+t .Zip Code: <br /> Desi ed UST operator ConducMg theInspection: 1 C 1 E A LZ=Q 'T r4�S <br /> International Code Council Certification#: 57_Cj y C.r I Expiration Date: o <br /> signature: Phone:(AL l ) G-6 Q W <br /> X�Yra,N=N NA=N'ot A lics'ble <br /> Item MONITORING PANEL I ALARM IIISTORY Y N NA <br /> I Monitoring system is powered on and in prooperatin mode. <br /> 2 Monitoring system is not currently showing any alarms or warnings. <br /> 3 Alarm history reportileg for the previous month is available,and has been reviewed by the <br /> Designated UST Operator. (Attach a copy a the alarm history re rt/ID to this form if available.) <br /> 4 Each alarm for the previous month has been responded to ro ri�afely. <br /> 5 Sensors located in tank-top oontainmrent n!Tps have not alarmed in the past month <br /> 5a List all tank-top sumps where alarms occurred in the past month: T'Z S'k" LOSS Q,e_wsl <br /> l Z- _ <br /> Note:Sumps where an alarm has accurrnd in the pastmonth must be inspected unless a palffied service teehnicfan responded to,and <br /> properly addr zs-ed,the cause of the alarm.Attaeh documentation verifying appropriate service to thisrd;P0A <br /> X'_.mp 2Wcnan is required,record results in item 6,belmv. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. sensors are located properly- <br /> Note:Visual inspection o sma s is on re mired in sumps where an alarm has.oceurred in the past month or which ihere is no service record <br /> Y N A Y N tJ <br /> Sun2 Location: l_`1 Sulu Location: SIP C,,ck L-Li <br /> Sum-p Locadon: L-`t Sump Location: <br /> Sump Location: L - 5 Sump Location: <br /> 7 Spill containment structures are fie sof water,debris,and hazardous submnce. <br /> PA, oj T Y N NA e e - T-I Y N NA <br /> Tank 1--Contents. Tank 3-Contents. E,jt <br /> Tank 2-Contents: I Tarek.4-Contents: <br /> S Under-dispenser containment areas arc free of water,debris,and hazardous substance_ Sensors are located ro rdY_ <br /> Y N NA Y N NA <br /> Dir user 112 Dispenser 9110 <br /> Dispenser 3/4 PLSPenser 11/12 <br /> Dispenser 5/6 Dispenser 13 114 <br /> Dispenser 7/8 Desenser 15/15 <br /> PAPERV4tORKINSPECTIO14 Y N NA DATE DONE <br /> 9 Monitoring em certification has been completed within past 12 months. <br /> 10 Secondary containment tests have been co leted within the aired timeframe. b- Z -!S <br /> 11 Spill containment structure(bucket)testingwas con leted within the ear- <br /> 12 Tank ti esu testing was completed within r uined timefirame. - <br /> t3 Line tightness testing was ca leted with m required timeframe- <br /> l4 other uired testis maintenance was completed within required timeframe. (List test/maintenance items below) <br /> Test/Maintenance: <br /> T'est/Maintenance: <br /> T'es#Maintenonce: <br /> b'ACII 1TY EMPLOYEE'TRAINING Y N NA <br /> 15 All facility em to ees have received the required on-the= training within the past <br /> 16 All facilitya loyees hired within the post 30 days have received the required on-thejob traimin . <br /> Note: Any answer of"N"should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Shirley Environmental Testing,Corporation <br /> 9595 Lucas Ranch Road,Suite#100,Rancho Cucamonga,CCA 91730 <br /> 800-533-4030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.