My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
4579
>
2300 - Underground Storage Tank Program
>
PR0231504
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 3:20:18 PM
Creation date
11/2/2018 7:52:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231504
PE
2381
FACILITY_ID
FA0003573
FACILITY_NAME
A & M MARKET*
STREET_NUMBER
4579
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01703053
CURRENT_STATUS
02
SITE_LOCATION
4579 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ACAMPO\4579\PR0231504\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/22/2011 8:00:00 AM
QuestysRecordID
98683
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERFORMED BY SACRAMENTO EQUIPMENT MAINTENANCE COMPANYv INC. <br /> 2533 CONNIE DRIVE — SACRAMENTO — CALIFORNIA — 95915 <br /> PHONE 916-925-2716 <br /> WORK ORDER k _ 62205 DATE <br /> SITE NUMBERe PRODUCT <br /> SITE NAMEe ASM Market STP BRAND , <br /> SITE ADDRESSz _ 4579 E. Acampo <br /> - Acampo .Ca . <br /> BED JACKET LEAK. DETECTOR TEST <br /> PRODUCT\.F UNLEADED, PP.Ek1UH-UHLERDED, DIESEL (CIRCLE ONE) <br /> NOTE: USE PARATE FORM FOR EACH TANK. <br /> 1) RUNNING PRESSURE <br /> 2) SHUT-OFF PRESSURE �. <br /> 3) AMOUNT OF PRODUCT RELEASED THRU BIBCOCK TO ZERO. It OZ. <br /> 4) WITH VALVE OPEN, START STP. LIS PRESSURE / PSI . <br /> 5) REDUCE FLOW TO RATE OF 7 OZ. PER MINUTE. <br /> LIST PRESSURE AT THIS FLOW RATE _7 PSI. <br /> 6) TURN STP OFF. LET PRESSURE DROP TO ZERO THRU LEAK JUST <br /> CREATED. LIST TIME FOR GAUGE TO REACH ZERO. _ MIN. �U SEC. <br /> 7) TURN THE STP BACK, ON. KEEP LEAY, RATE AT BIBCOCK�.�� <br /> LIST PRESSURE 0' PSI. FLOW RATE AT 14OZZLE _._!_..L GPM. <br /> 8) STOP LEAY, WITH STP STILL ON. <br /> DOES LEAK DETECTOR RESET? 6/ES NO <br /> IF YES, HOW LONG TO RESET? MIN. _ SEC. <br /> 9) TURN STOP OFF. LIST PRESSURE A2_� PSI. <br /> 10) TURN STP BACK. ON. <br /> LIST TIME TO REACH PRESSURE RISE. MIN. SEC. <br /> 11) LIST PRESSURE -2L PSI. <br /> 12) OPEN NOZZLE AND LIST PRESSURE 7 PSI. <br /> 13) SATISFACTORY LEAK DETECTOR SES NO. <br /> THIS TEST IS FOR LEAY. DETECTOR SERIAL tt <br /> LEAY, DETECTOR <br /> (OLD) MODEL DATE CODE & SERIAL NUMBER <br /> (NEW) MODEL DATE CODE & SERIAL NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.