My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3133
>
2300 - Underground Storage Tank Program
>
PR0232349
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:42:58 PM
Creation date
11/2/2018 7:53:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232349
PE
2381
FACILITY_ID
FA0003512
FACILITY_NAME
DISPLAY TECHNOLOGIES
STREET_NUMBER
3133
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
08710073
CURRENT_STATUS
02
SITE_LOCATION
3133 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AD ART\3133\PR0232349\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/21/2011 8:00:00 AM
QuestysRecordID
98567
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA `001 <br /> STATE WATER RESOURCES CONTROL BOARD i +ate <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B o� u <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY W 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ,FL—= 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE O 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 313 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D. B. MANUFACTURED BY: '� <br /> C. DATE INSTALLED(MQ(DAY/YEAR) (Ny� D. TANK CAPACITY IN GALLONS: <br /> II.TANKCO NTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL 8' C. Epor#UREGULAR NLEADED 3 DIESEL ❑ e AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY EpllePRODUCT ❑ ib PREMIUM 4 GASAHOL O 7 METHANOL <br /> UNLEADED ❑ 5 JETFUEL <br /> ❑ 3 CHEMICAL PRODUCT O 95 UNKNOWN O 2 WASTE O 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK NE ITEM ONLY IN BOXES A,B.AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL F—] 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL 2 STAINLESS STEEL E] 3 FIBERGLASS E 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ e POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) O 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> 1 RUBBER LINED Nw <br /> ALKYD LINING 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING UNLINED ❑ 95 UNKNOWN 99 OTHER <br /> LINING ❑ <br /> IS LINING MATERIAL COMPATIBLE100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP O COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 9 NONE ❑ 95 UNKNOWNO 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED AR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGRODORUIFUNDERGROUND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U APRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 BLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 TAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U B C CRETE A U 7 STEEL W/COATING A U 8 100 METHANOL COMPATISLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 THODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ 3 99 OTHER <br /> MONRORING ❑ <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 8 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> I.ESTI A D DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 6 SIGNATIREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMIT M R q PERMIT APPROVED.B /DATE qJ PERMIT EXP( NDAT <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORMA,UNLESS A CURRENT FORMA HAS BEE <br /> / FOR(KNIBR5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.