My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ADAMS
>
1141
>
2300 - Underground Storage Tank Program
>
PR0518085
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:31 AM
Creation date
11/2/2018 7:58:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0518085
PE
2361
FACILITY_ID
FA0013686
FACILITY_NAME
JOE WILSON CENTER MUSEUM
STREET_NUMBER
1141
STREET_NAME
ADAMS
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23313020
CURRENT_STATUS
02
SITE_LOCATION
1141 ADAMS ST
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ADAMS\1141\PR0518085\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 PHYSICAL HAZARDS DURING OPERATIONS <br />The physical hazards expected to be encountered during work activities are listed below as: <br />slipping, tripping falling, strains, cuts, bruises, puncture wounds, pinch points from <br />heavy equipment, falling objects and splinters. <br />Exposure to these hazards will be minimized by using safe work practices and personnel protective <br />equipment such as steel toe, steel shank boots, etc. <br />SECTION 4.0 PROTECTIVE EQUIPMENT <br />4.1 PERSONAL PROTECTION <br />Level D protective gear will be used on site. The proper equipment for this level includes: <br />1. Gloves <br />2. Hard hat; <br />3. Boots - inner, steel -toed and shank, neoprene; <br />4. Protective coveralls or work pants with long sleeve shirt <br />5. Safety glasses or safety goggles. <br />SECTION 5.0 WORK ZONES <br />The work zones will be determined by the Project Manager and the Site Safety Officer before the start of <br />operations. The three zone system will be employed. i.e. exclusion zone, contamination reduction zone, and <br />support area. <br />SECTION 6.0 DECONTAMINATION PROCEDURES <br />Personnel equipment worn into the Contamination Zone will be decontaminated by laundering. <br />Equipment will have gross soil scraped off and placed with other soil taken from excavations. If gross <br />contamination is present revisions to this section may be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.