Laserfiche WebLink
%W v <br />PUBLIC HEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Karen Furst, M.D., M.P.H., Health Officer <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />I. GENERAL INSTRUCTIONS: <br />1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br />to the applicant with comments. <br />�{ 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, <br />!� streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br />wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and <br />distance of piping from tank to dispensers. If underground utilities are not included on the site map, you <br />must state in writing that USA Dig will be contacted prior to excavation activities. <br />3. Complete page 31 "Application for Underground Storage Tank Closure Permit of : Sam lin <br />X firm shall be an independent third party from the contractor. <br />[ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the facility. <br />5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br />Worksheet". <br />6. Complete all questions on page 10, the Public Health Services -Environmental Health Division (PHS- <br />EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a signature <br />and date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br />completed and returned to PHS-EHD within 30 days of the tank removal. <br />7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards <br />for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />8. If facility is located outside of the city limits, submit a 'Backfill Excavation Certificate" as required by <br />the County of San Joaquin Building Department and the incorporated City Building Departments, pursuant <br />to the Uniform Building Code STD 70-11. <br />[ ] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br />approval of the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br />plan. If gross deficiencies are identified, an addendum will be required with a $87.00/hour fee and the <br />review will begin on the date of resubmittal. <br />[ ] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />[ ] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD. <br />[ ] 13. Submit Contingency Plan for over -excavation at time of UST removal (if planning to over -excavate). <br />See "III. SITE MITIGATION" on Page 2. <br />EH 23 046 (Revised 09/21/00) Page 1 <br />A Division of San Joaquin County Health Care Services <br />