Laserfiche WebLink
0 <br />Monitoring System Certification - Page 2 of 3 <br />IL LLM4L6 ir-_- <br />JUL 15 2916 <br />Site Address:_ 1409 S. Airport Way i Data-cfTestinoervieing: 6116116 <br />D. Results of Testing / Servicing <br />Software Version Installed. 327.04 <br />Complete the following checklist: <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />® Yes <br />❑ No* <br />I Is the visual alarm operational? <br />IN Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />® Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />❑ N/A <br />operational? <br />® Yes <br />0 No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />O N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 11 Yes ❑ No <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />® N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fillpoint(s) and operating ro erl ? if so, at what ercent of tank capacity does the alarm trigger? 0 % <br />®Yes* <br />❑ No <br />Was any monitoring equipment replaced? Ifyes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />17 Yes* <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />® Yes <br />11 No* I <br />Was monitoring system set-up reviewed to ensure proper settings? Attach sef-up reports, i a licable. <br />® Yes <br />❑ No* I <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: Replaced TLS Battery for PM purposes. <br />87 & 91 are split tanks and share Annular. <br />