Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: RANCHO SAN MIGUEL 1409 AIRPORT WAY STOCKTON CA 95205 <br /> ATG <br /> . . . . . . . . . . .3. . . . . . . . . . &. . . . . . . . . . . . . . . . . . . . . <br /> F-1. F-1 . . . . . . , . r <br /> 2 . . . . . 4. . . . . . . . . . . . . .6 . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . A x T . . . . . . . . . . <br /> P <br /> . . . . . . . . . . . . . . <br /> T <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> A=ANNULAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE <br /> T=TLIRBINE . . . . . . . <br /> . . . . . V=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . X=SENSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> F=FILL . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . VENTS. . . . . . . <br /> . . . . . . . . . . . . <br /> Date map was drawn: 6122/11 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping, Clearly identify locations of the following equipment,if instaHed:monitoring system control panels;sensors monitoring lank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br />