Laserfiche WebLink
I t i ! <br /> o. Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> mpfete the following checklist: <br /> ® Yes ❑ No' Is the audible alarm operational? <br /> ❑ Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> N/A <br /> I� Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a <br /> ❑ N/A leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check alf that apply) <br /> Sumplrrench Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failureldisconnection? 0 Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monAoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® NIA installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank <br /> capacity does the alarm trigger? 0% <br /> ❑ Yes' ® No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer <br /> name and model for all replacement parts in Section E,below. <br /> Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below, <br /> 10 0 Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: HAD TO TEST SPILL BUCKETS AT RING . OTHERWISE LEAKED IN SUMP . PER RAY <br /> Monitoring System Certification Page 2 of 4 2/2I/07 <br />