Laserfiche WebLink
SWRCR January 2002 <br /> Page 3 of 7 <br /> Job: Rancho San Mi.t�ucl <br /> Date: 3/6/09 <br /> 5. SECONDARY PIPE TESTING <br /> Test Metl-iod Developed By: [ ] Piping Manufacturer [X] Industry Standard ]Professional <br /> Engineer <br /> f Cather(,5pecify) <br /> Test Method Used: [ x] Pressure ]Vacuum ]Hydrostatic <br /> ]Other(SpeC6) <br /> Test E ui ment Used:Pressure Gauge Equipment Resolution; 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> REG VENT SUPER VENT <br /> Pi ing Material: Fiber Glass Fiber Glass <br /> Pi pin!Manufacturer: Smith Smith <br /> Piping Diameter: 31° 314 - <br /> Leiyth of Piping Run: 22 il: _ 2z f <br /> Product Stared: None/Vent None/Vent -- <br /> Method and location of 'rest Boots Test Boots <br /> i in -run isolation: <br /> Wait time between applying 3 min .3 min <br /> pressure/vacuum/wa.ter and <br /> starting test: <br /> 'Pest Stara;Time: 9:45 am 9:45 am <br /> Initial Rea& (R1) 3Lb 3T,b <br /> Tcst End Time: 10:45 am 10:45 am — <br /> Final Reading 3Lb 3Lb <br /> Test T5uration: I hour T. hour <br /> Change in Rea_ditq;Olf-RI 0 p <br /> Pass/Pail Threshold or No loss No toss <br /> Criteria: <br /> Ttst result: JX]Pass f I Fail fX I t'hss I I Vail I I rasa C j pall <br /> !.)sirissf 7i>N'ui1 t C:i"�9s C ]-Fail <br /> Comments—(include information on repairs made prior to testing,and mcornmended follow-up for failed tests) <br /> Retest 6 mos after replacemcnt of Test Boots original permit (Srt 0055105) <br />