Laserfiche WebLink
! 0 <br /> d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> 6. Contact.Ray von Flue(468-9848)to arrange the following inspections(a 48-hour notice <br /> is required): <br /> a. Verify five gallon capacity and drain valve operation of the spill container. <br /> b. Witness sixty minute hydrostatic test (or equivalent)on the spill container. <br /> 7. An "Underground Storage Tank Certification of Installation/Modification" form shall be <br /> submitted by the owner or the owners'agent [pursuant to(CCR)2635(d)] before this <br /> upgrade will be considered complete by EHD. <br /> 8. The permit expires 180 days from the approval date. <br /> Ray von Flue, REHS <br /> Senior Registered Environmental Health Specialist <br />