My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:31 AM
Creation date
11/2/2018 8:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2004-2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: I1 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,includi=_�forground❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buil❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist comp <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete—the following checklist: <br /> Ca'Yes ❑ No* For equipment start-up or annual equipment cea ion, was a leak simulated to verify LLD performance? <br /> ElN/A (Check all that apply) Simulated leak rate: ❑"§g.p hat❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y s ❑ No* Was the testing apparatus properly calibrated? <br /> [drYes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ IJoy' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> LX—NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> - <br /> U-N/A or fails a test? <br /> [aLKNA o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> o* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 7-4 P �� ' /t�D�s LIb� !�d J--)T/ <br /> �i <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.