Laserfiche WebLink
r <br /> 9. SMIJOVFRFILL CONTAP4—NMN C BOXES Page 7 of 7 <br /> Fac_i1ity is Not 1r i ed With S ilUOverfill Containment Boxes <br /> Spill/Overfill Contaitiment Boxes are Present,but were Not Tested V <br /> Test Method Developed By: 11 Spitl Bticket Manufacturer 0 Cndustty Standard r Professional Engineer <br /> 7 4thcr(Specr�y) <br /> Test Method Used: U Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: >?quiprnent Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vamim/water and <br /> stgrtira test: <br /> Test Start Time: <br /> Initial Reading <br /> Test End Time: <br /> Final Reading <br /> Test Duration: <br /> Change itt Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result-: 1 0 Pass 0 Fail a pass Q Fall 0 Pass U 1811 Cl Pass 0 Fail <br /> COMM Mt9—(include information on repairs made ri-ar to Las , and recommended folfow- for sled tests <br /> �.. ��►>r�efis a�ssed reau�s� test an..�v m _� '(� 5 <br /> Signature Of Company tepresent$tive Date <br />