My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATING <br /> Iit CHARACTERISTICS SIR <br /> The FE Petro STP-MLD leak detector static system pressure,3 GPH leak is present.If there are no leaks, <br /> is a three position,pressure-sensing, (at 10 psi)is metered through the pressure rapidly builds in the system <br /> piston operated valve.It is designed to STP-MLD into the piping system.If a leak forcing the STP-MLD to open to the full- <br /> continuously monitor the piping is present that equals or exceeds this flow position.In a system with no leaks, <br /> between the discharge of the amount,as much product escapes from it takes approximately two to three <br /> submersible turbine pump and the system as is metered through the seconds for a complete test.No further <br /> the solenoid valve in a service STP-MLD.Under this condition,pressure line testing takes place until the line <br /> station dispenser. cannot build up in the piping system. pressure drops significantly below the <br /> When a nozzle is opened,a poppet in the normal static system pressure with the <br /> When the submerged turbine pump is STP-MLD moves to a position that pump off. <br /> turned on after the system pressure has restricts the flow to less than 3 GPM.This <br /> dropped significantly below the normal is the indication to the operator that a <br /> r <br /> I <br /> .,r <br /> 1. The Tripped or Bottom 2. Leak Sensing Position 3. Non-Leak or Full Flow <br /> Position In this position,the system pressure has Position <br /> When thesystem pressure is less than increased to approximately 12 psi.All the This position allows full flow.The poppet <br /> 1 psi,the piston and poppet are in the flow must travel around the metering will remain in approximately this <br /> "bottom"or"tripped"position.In this pin which limits it to approximately a 3 position as long as the system pressure <br /> position,product flows through the GPH rate(at 10 psi).If there is a leak in remains at about the pumping pressure. <br /> horizontal hole in the poppet and the system which will allow leakage to If the pressure in the system drops when <br /> around the metering pin at a flow rate of exceed this amount,the line pressure the pump is turned off,either due to <br /> approximately 2 to 3 GPM into the will not build beyond this point and the thermal contraction of the product or <br /> delivery line when the submersible valve will remain in the leak sensing due to a leak,the piston moves <br /> pump is running.In normal operation position with the main flow blocked.If downward and the poppet engages and <br /> the piping remains full of fluid and when there is an attempt to dispense while the seals inside the cage at about 3 psi,or <br /> the submersible pump is turned on,the valve is in this position,the line pressure approximately 10 feet of head,in <br /> flow rate of less than 3 GPM allows the will drop to less than 1 psi,the piston will gasoline.Any time the pump is turned <br /> pressure to build rapidly,moving the respond,and the poppet will return to on after the seal on the poppet is inside <br /> poppet to the leak sensing position. Position 1 where less than 3 GPM will the cage,a line test will be performed. <br /> flow to the dispensers.Leaks smaller <br /> than 3 GPH will be indicated by the STP- <br /> MLD taking longer than three seconds to Z <br /> open completely because some of the — = = = �. _... <br /> flow leaks out of the system and the rest_ FE Petro,Inc,■4805 Voges Road <br /> builds pressure.If there is no leakage in P.O.Box 139 r McFarland,WI 53558 <br /> the system,the small flow around the (608)838-8786■Fax:(608)838-6433 <br /> _ metering pin Increases the line pressure Ell, Jepetro@fepetro.cum <br /> and in approximately three seconds Website:http://w-ww.fepetro.com <br /> the piston will move the poppet to From USA&Canada Phone: <br /> Position 3. 800-225.9787 <br /> From Mexico Phone:001-800-738-7610 <br /> MLDB001 7/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.