My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLASTEE'&'.@ELUTR0r*1' Double-Wall <br /> INSTALLATION INSTRUCTIONS Tank <br /> 0 <br /> I. GENERAL may set and securely anchor the ELUTRON" tank on the pad <br /> with a minimum of 6" of backfill between tank bottom centerline <br /> The PLASTEEL°ELUTRON® underground tank is a and the pad.Upon local implementing agency approval,you may set <br /> U.L. Listed Jacketed tank providing corrosion protection and 360° and securely anchor the ELUTRON' tank directly on the <br /> secondary containment per U.L. 1746 and 58. smooth, flat pad taking care to place a 12" wide x I" thick piece <br /> ELUTRON®underground tanks must be installed according of felt between the entire tank bottom centerline and the pad to <br /> to these installation instructions, the latest issue of the Flammable minimize damage during placement. Consult factory for other <br /> and Combustible Liquids Code, N.F.P.A. 30 for underground tanks anchoring techniques, <br /> and the authority having jurisdiction. <br /> The installer and/or owner must read and be familiar with the VI. TESTING <br /> entire installation instructions and Appendix A prior to installing the PRE-INSTALLATION: Aboveground, prior to replacement of <br /> ELUTRON' tank. To activate the PLASTEELx tank in excavation, precisely follow one of the three testing options <br /> ELUTRON'Tank Warranty,a completed and signed Certificate cited in Appendix A attached.Do not deviate from these procedures. <br /> of Installation for the PLASTEEL' ELUTRON' If the ELUTRON® tank is delivered with a vacuum on the <br /> Underground Tank must be returned to the manufacturer. For interstice,refer to Option#2 of Appendix A. <br /> additional installation references,consult the current editions of: CAUTION: IF OPTION #3 IS USED. DO NOT APPLY ANY <br /> — Petroleum Equipment Institute,RP-100 PRESSURE TO THE INTERSTICE BEFORE <br /> — American Petroleum Institute, RP-1615, THOROUGHLY UNDERSTANDING AND FAITH- <br /> I1. VISUAL INSPECTION FULLY FOLLOWING THE PROCEDURES CITED <br /> IN OPTION #3 OF APPENDIX A. DAMAGE TO <br /> Prior to setting tank in hole, inspect exterior for damage. If tank TANK MAY OCCUR IF YOU DEVIATE FROM <br /> exterior is damaged,call factory regarding correct repair procedures. THE PROCEDURES AND SPECIFICATIONS. <br /> Exterior damage is indicated when the blue color of the FRP POST-INSTALLATION: Complete the backfill procedures to <br /> laminate has shown a white fractured pattern. the top of the tank. Complete all piping and connections ensuring <br /> that unused openings are secured tight with threaded steel plugs. <br /> AM. HANDLING Apply a 5 PSIG pressure test in the primary tank and check for tight- <br /> Good construction engineering practice,cowman sense and safety ness of piping connections and tank manhole covers.Gauge should <br /> be checked prior to testing for accuracy and have a maximum limit <br /> must prevail during this phase. ELUTRON' tanks are not to be <br /> dropped or rolled off of the delivery vehicle onto the ground or into of 15 PS IG. <br /> the hole.The lifting hook or hooks provided must be used in combi- CAUTION: THE PRIMARY TANK TEST PRESSURE SHALL <br /> nation with the proper capacity unloading equipment. It is the NOT EXCEED 5 PS1G. DAMAGE TO TANK <br /> responsibility of the owner to provide the qualified personnel and MAY OCCUR. ISOLATE PIPING FROM TANK <br /> safe,proper unloading equipment,with specific consideration given BEFORE TESTING THE PIPING AT HIGHER <br /> to tank weight and reach distance to set tank in excavation. The PRESSURES. <br /> preferred lifting cable included angle is 60° and must never exceed The interstice(annular space)will be tested using option#2 or#3 <br /> 120°.A spreader bar may be used to achieve this angle. in Appendix A. <br /> IV. EXCAVATION DEPTH, OPTION: See Appendix B for procedures to perform the <br /> BEDDING AND BACKFILL Interstitial Vacuum Test that has been third party <br /> evaluated to meet the EPA tank tightness test <br /> Follow all applicable local regulations and codes. When protocol. <br /> excavating,allow a minimum clearance of 6"for backfill around the <br /> tank.For minimum burial cover,consult N.F.P.A.30. If burial cover VII. VENTING <br /> over top of tank exceeds five (5) feet, consult factory. Backfill The PRIMARY (inner) tank must always be vented to <br /> materials should be clean, debris free, sand or pea gravel. atmosphere. The interstitial space does not require venting. <br /> Hydrocarbon exposed sand or pea gravel may be re-used if approved However, local codes may require such interstitial venting. Comply <br /> by the AHJ. Native sand may be used if approved by the tank man- with N.F.PA. 30. <br /> ufacturer and the AHJ.Allow a minimum of 12"of backfill between <br /> traffic slab and all appurtenances that are attached to the tank. CAUTION: DO NOT MANIFOLD VENT FROM PRIMARY <br /> Damage to tank may occur if surface traffic loads are transmitted TANK TO VENT FROM INTERSTITIAL SPACE- <br /> directly to tank. <br /> VIII. PLASTEEL®SEALING <br /> V. ANCHORING SYSTEMS PROCEDURES <br /> UTION: The decision to use an anchoring system is the These procedures must he performed prior to completion of <br /> responsibility of the owner. Damage to the tank may backfill and AFTER TESTING. To ensure complete corrosion pro- <br /> occur if the tank is subjected to movement. tection.the following instructions must be followed: <br /> Consult the factory for number, size and type of holddown a. General instructions for .working witli fiberglass resin <br /> assemblies required when using a concrete pad under the tank. You By carefully performing the following steps,your ELUTRON' <br />
The URL can be used to link to this page
Your browser does not support the video tag.