Laserfiche WebLink
Plasteel® petrf.First�M - <br /> [fin <br /> 1�1zed� AtefingCom leFuelingSysteft <br /> � to �/e>h�ef a <br /> The Canopy <br /> I , 0 <br /> L f L, HA <br /> A <br /> '.47 <br /> 4 All Piping Integral To The <� <br /> Tank System Simple And P <br /> Expeditious <br /> Welded Steel Piping To Install 1` - <br /> Factory Fabricated Cost Effective <br /> And Tested hh� <br /> Easy-To-Follow <br /> Secondary Contained Installation <br /> ti <br /> � ons Interstitial Monitoring Instructions <br /> lull <br /> --------- -----�-Grade <br /> PLASTEEL° ELUTRON° "f . +���� •, <br /> AND PLASTEEL COMP©SITE° 1 INTEGRAL <br /> UL Tested And Listed For External structural Pressure CANOPY COLUMN <br /> UL Tested And Listed For Corrosion Protection SUPPORT SYSTE M <br /> UL Listed 3600 Secondary Containment <br /> UL Listed To Comply With UL standards 58 & 1746 Professionally engineered <br /> Compliance To Fire Codes: NFPA-30 And Uniform Fire Code for effects of Wind, snow, <br /> Approved For Use: ExxonMobil, shell Services International, fatigue stress, seismic and <br /> Texaco International. vehicle impact. U. L. Listed <br /> Petro-First'"Systems Operating In: U.S.A.;Caribbean; and Tested. <br /> South America;Europe <br /> r , {�+`�i 2541 State Street, Suite 205 <br /> POSTE Carlsbad, CA 92008 <br /> R ��``��. ��`��,,� Tel:(6)7291093 Fax: (760)729-1096 <br /> INTERNATIC)NAL INC. <br /> "� `.�` www.piasteel.com <br /> 30 year e-mail:tan ktech@plasteel.com <br /> limited warranty Licensed Plasteel" Petro-First" Manufacturer <br />