Laserfiche WebLink
s � <br /> UST SYSTEM DRAWING INFORMATION 0 <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment is be <br /> installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. wank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s)and piping approved by a nationally recognized indeperdent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues,etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices,etc. <br /> 10. At the installation site, prior to installation,a tightness test shall be performed on both primary(10)and secondary <br /> ,, (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. �f,� xTank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# 1 2 a <br /> CAPACITY 20 000 10,000 <br /> MANUEACTURER K&T Steel K&T Steel <br /> PetroFirst PetroFirst <br /> 87 91 <br /> CORROSION Fiberglass Fiberglass <br /> 58/1746 58/1746 <br /> COMPATIBILITY Yes Yes <br /> WITH <br /> 13. TANK(s)TO BE INSTALLED <br /> X A. Steel-clad with fiberglass reinforced plastic coatings,composites, or equivalent non-metaWc.exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> X (2) Vacuum applied to interstitial space. <br /> a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation, <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />