Laserfiche WebLink
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: Rancho San Miguel ADDRESS: 1409 Airport Way Stockton <br /> PR# TANK# 2 UL# TANK MODELJMATERIAL: Petro First <br /> COMPARTMENTALIZED TANK? (If yes, complete one form for each tank) ( YES) NO <br /> FTANKCAPACiTY.: 10 000 PRODUCT: 91 Octane <br /> {TATE A INITIALS <br /> P <br /> P <br /> R ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE WITH MANUFACTURER WRITTEN <br /> v SPECIFICATIONS <br /> E <br /> 0 <br /> 1. Ugi TTEQ AND FEES,PAID -(H&-,rQQF SECTION 2528Z) <br /> 2UST-INSTALLATION PI ANS APROVIFD <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY TEST: VACUUM: SOAP: <br /> 4 PRIMARY TANK IF;T- <br /> PIPING INSPECTIONS <br /> R, PRIMAELY EIPING TEST(M INIMLI PSI/30 MIN) , [CCR 2636(41 <br /> -8 LAKE TESI ON ALL SLIMPS,(24 HE MINIMUM) HRS- [CCR 2635(n)(4)1 <br /> -11-ALI PIE INC,AND FITTINGS CORROS ION PR OTECTED [CC R 96 i6(h)l <br /> FINAL INSPECTION <br /> 11 PERFORMANCET ST FOR'ALL-MQNITORING PRQRFS [CCR 2632(c)(2)] <br /> 15PERFORMAbICF TEST OF I INE LEAK DPTF:(-TIQN <br /> 18, PERFOEMANCE TEST-QE AUTOMATIC E IME SYSTEM SHI IT OFF [CCR 9636(g)l <br /> RFI1 L PROTECTION INSTALI Fn AND APPROVED r(-(-R 263 (b)(2)l <br /> 19 TANK ACCESS PORTS BROUGHT To GRADE(LOCKED AND WATERTIGHT) API <br /> 20 TANK INTEGRITY TEST PERFORMED(HARD CQPy SUBMITTED) 2635(a)(5)1 <br /> 21- moWjnRiNG PLAN- RE-,PONSE P1 AN AND LOG BOOK ON SITE 2632(d)l <br /> 23-MONITORING METHOD FOR At I TANKS AND PIPING APPRQVFQ rCCR2630-2636) <br /> 24- Al-i.CONDITIONS MET-FACILITY PEBMIT ISI JED (H&S CQDF 2525_4)_. <br /> COMMENTS <br /> EH23 046 3/15/02 <br /> 10 <br />