My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: Rancho San Miguel ADDRESS: 1409 Airport Way Stockton <br /> PR# TANK# 2 UL# TANK MODELJMATERIAL: Petro First <br /> COMPARTMENTALIZED TANK? (If yes, complete one form for each tank) ( YES) NO <br /> FTANKCAPACiTY.: 10 000 PRODUCT: 91 Octane <br /> {TATE A INITIALS <br /> P <br /> P <br /> R ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE WITH MANUFACTURER WRITTEN <br /> v SPECIFICATIONS <br /> E <br /> 0 <br /> 1. Ugi TTEQ AND FEES,PAID -(H&-,rQQF SECTION 2528Z) <br /> 2UST-INSTALLATION PI ANS APROVIFD <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY TEST: VACUUM: SOAP: <br /> 4 PRIMARY TANK IF;T- <br /> PIPING INSPECTIONS <br /> R, PRIMAELY EIPING TEST(M INIMLI PSI/30 MIN) , [CCR 2636(41 <br /> -8 LAKE TESI ON ALL SLIMPS,(24 HE MINIMUM) HRS- [CCR 2635(n)(4)1 <br /> -11-ALI PIE INC,AND FITTINGS CORROS ION PR OTECTED [CC R 96 i6(h)l <br /> FINAL INSPECTION <br /> 11 PERFORMANCET ST FOR'ALL-MQNITORING PRQRFS [CCR 2632(c)(2)] <br /> 15PERFORMAbICF TEST OF I INE LEAK DPTF:(-TIQN <br /> 18, PERFOEMANCE TEST-QE AUTOMATIC E IME SYSTEM SHI IT OFF [CCR 9636(g)l <br /> RFI1 L PROTECTION INSTALI Fn AND APPROVED r(-(-R 263 (b)(2)l <br /> 19 TANK ACCESS PORTS BROUGHT To GRADE(LOCKED AND WATERTIGHT) API <br /> 20 TANK INTEGRITY TEST PERFORMED(HARD CQPy SUBMITTED) 2635(a)(5)1 <br /> 21- moWjnRiNG PLAN- RE-,PONSE P1 AN AND LOG BOOK ON SITE 2632(d)l <br /> 23-MONITORING METHOD FOR At I TANKS AND PIPING APPRQVFQ rCCR2630-2636) <br /> 24- Al-i.CONDITIONS MET-FACILITY PEBMIT ISI JED (H&S CQDF 2525_4)_. <br /> COMMENTS <br /> EH23 046 3/15/02 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.