My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Franzen-Hill <br /> 03 _8 h1i 9: 56 Fueling Facilities System Design,Construction&Maintenance <br /> DECUL California Licensed Contractor No.304147 <br /> December 5, 2003 <br /> 6069 <br /> Environmental Health Dept. <br /> San Joaquin County <br /> 304 E. Weber Ave, Third Floor <br /> Stockton, CA 95202-2708 <br /> Attn: Dina Abate <br /> Re: Rancho San Miguel Market 1427 Airport Way, Stockton 95206 <br /> Job 03-0405 <br /> Dear Dina: <br /> This is regarding your faxed letter date 12/1/03. The following corrections have <br /> been made: <br /> Items: <br /> 1. <br /> A. The drawing on Page 1 shows the containment sump around the <br /> fills on the 91 Octane tank and the 87 Octane tank. <br /> B. The fuel piping on Page 1 is the correct lay out for the <br /> installation, the section on Page 3 was only to show the burial <br /> depth and the placement spacing of the line,we removed that <br /> from the drawing. <br /> 2. Vent Line and monitoring system has been included on page 3-D <br /> 3. The dispenser cross section has been added on sheet 3. <br /> 4. The slope on all vent, vapor and product line has been shown on page 1 <br /> and page 3 included the slope back to tanks. <br /> 5. The line leak detection that is to be installed is a FE Petro STP-MLD-E <br /> Color Gray for use with flexible piping system a cut sheet has been <br /> included. Also included are corrected application sheets Page 8 and <br /> additional submittals (monitoring Plan Page 1) with corrected part <br /> number. <br /> 6. There will be VeederRoot Model 794380-208 Sensor will be installed in <br /> every under dispenser containment, Detail B was a misprint and it has <br /> been removed from the dispenser pan drawing <br /> 1100 North J Street,Tulare,CaUornia 93274-19391559-688-29771800-655-34361559-686-1467 FAX <br /> www.fTanzen-hill.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.