My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1611
>
2300 - Underground Storage Tank Program
>
PR0515591
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 1:33:10 PM
Creation date
11/2/2018 8:21:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0515591
PE
2381
FACILITY_ID
FA0012239
FACILITY_NAME
ULTIMATE CONTAINER
STREET_NUMBER
1611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16905003
CURRENT_STATUS
02
SITE_LOCATION
1611 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1611\PR0515591\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SPECIFIC SAFETY PLAN <br /> INTRODUCTION <br /> This document describes the health and safety procedures for the <br /> activities planned in ---formina a preliminary site investigation at <br /> 1611 S. AIRPORT WAY,6TOCKTON,_C9 45.206 All personnel and <br /> subcontractors will follow this plan. The prime responsibility for <br /> employee safety lies with each company that is involved in the work <br /> for it' s own employees . It is expressly intended that all project <br /> work will comply with applicable sections of the California <br /> occupational Health and safety code. All parties working on this <br /> project will maintain a general responsibility to identify and <br /> correct any health and safety hazards and are responsible for working <br /> in a safe manner. <br /> Key Personnel <br /> Project personnel who will have overall responsibility for the safe <br /> operation of this are: <br /> Site Contact: FLOYD SMITHSON, OPERATIONS MANAGER FOR OWNER <br /> (530) 478 6464 <br /> Project manager and <br /> Rite Safety Officer <br /> JIM HOBLITZELL <br /> REGISTERED ENVIRONMENTAL ASSESSOR, REA- <br /> 03121 <br /> Project Manager and Safety Officer Responsibilities : <br /> * To conduct initial site safety training for all project <br /> field team members as described in this document, <br /> * To assure all field team personnel have read and <br /> understand the Health and Safety Plan, <br /> * To assure that all work performed on this project is <br /> conducted in a safe manner, <br /> * To coordinate with field personnel fire-watch, traffic <br /> control and site security, <br /> SITE SAFETY PLAN (SSP) - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.