My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1611
>
2300 - Underground Storage Tank Program
>
PR0515591
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 1:36:44 PM
Creation date
11/2/2018 8:22:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0515591
PE
2381
FACILITY_ID
FA0012239
FACILITY_NAME
ULTIMATE CONTAINER
STREET_NUMBER
1611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16905003
CURRENT_STATUS
02
SITE_LOCATION
1611 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1611\PR0515591\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> s <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DMSION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> APPLICATION FOR PERMIT TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> I. GENERAL INSTRUCTIONS: <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br /> to the applicant with comments. <br /> (] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, <br /> streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br /> wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and <br /> distance of piping from tank to dispensers. If underground utilities are not included on the site map, you <br /> must state in writing that USA Dig will be contacted prior to excavation activities. <br /> [] 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". Note: Sampling <br /> firm shall be an independent third party from the contractor. <br /> [ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br /> Worksheet". <br /> [ ] 6. Complete all questions on page 10, the Public Health Services-Environmental Health Division (PHS- <br /> EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a signature <br /> and date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br /> completed and returned to PHS-EHD within 30 days of the tank removal. <br /> [] 7. Submit a "Site Health & Safety Plan' as an addendum to this application, to address all potential <br /> hazards for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [] 8. If facility is located outside of the city limits, submit a 'Backfill Excavation Certificate" as required by <br /> the County of San Joaquin Building Department and the incorporated City Building Departments, <br /> pursuant to the Uniform Building Code STD 70-11. <br /> [] 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PH5- <br /> EHD approval of the closure plan. <br /> [ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately <br /> completed plan. If gross deficiencies are identified, an addendum will be required with a S78.00/hour <br /> fee and the review will begin on the date of resubmittal. <br /> [] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> [] 12. Advance inspection notice of at least 48 hours is required by PHS-EHD. <br /> EH 23 046 (Revised 10/19/98) Page 1 <br /> A Division of San Joaquin Count/Health Grc Scmcas <br />
The URL can be used to link to this page
Your browser does not support the video tag.