Laserfiche WebLink
September 14, 1988 As per Bill Snavely, no fees or quarterly <br /> reports have been received from lessee. <br /> Compliance date has passed. Will send office <br /> hearing to the owner of property or Ralph L. <br /> White. <br /> September 20, 1988 Entry in file by Mr. Snavely to prepare a <br /> District Attorney summary to request legal <br /> action against operator and owner of the <br /> facility. There is no record of any legal <br /> summary in the file. <br /> December 15, 1988 Bill Snavely sent an inter-office memo to <br /> Donna Heran and Ron Valinoti. <br /> November 15, 1989 Charles Hunt reviewed this file and <br /> documented the following violations: (1) No <br /> precision test results, (2) No quarterly <br /> reports, (3) No meter calibration results <br /> have been received by PHS-EHD. Also, the <br /> facility has not paid penalty fees for 1988. <br /> Charles Hunt contacted the land owner, Ralph <br /> White and UST operator, Phuc Van Huynh, <br /> regarding the violations. <br /> January 7, 1991 Charles Hunt performed a routine UST <br /> inspection on the site. Violations from the <br /> November 3, 1987, inspection and the June 16, <br /> 1988, office hearing have not been corrected. <br /> Mr. Hunt provided handouts to assist operator <br /> in monitoring USTs. <br /> January 16, 1991 Mr. Hunt updated file with new operator' s <br /> name, Minh Van Bui. <br /> February 26, 1991 PHS-EHD received copies of passing UST <br /> precision test results performed February 22 , <br /> 1991. <br /> June 28, 1993 Eleanor Ratliff conducted a routine <br /> inspection with Peter Bui. Violations noted <br /> were: (1) No permit, (2) No tank and pipeline <br /> precision tests for 1992 or 1993 , <br /> (3) Monitoring records are not available at <br /> the site, (4) Inventory reconciliation is not <br /> being performed, (5) Liquid level <br /> measurements are not being made, (6) Dip <br /> stick in 1/8 inch increments and appropriate <br /> calibration chart are needed, (7) Annual <br /> reports are to be submitted. Ms. Ratliff <br /> left UST monitoring handouts on site with <br /> operator. <br /> August 1, 1993 Ms. Ratliff filed passing precision test <br /> results from July 23 , 1993 . <br /> 5 <br />