My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2944
>
2300 - Underground Storage Tank Program
>
PR0521334
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:33 AM
Creation date
11/2/2018 8:25:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0521334
PE
2332
FACILITY_ID
FA0014502
FACILITY_NAME
PEWITT COMMERCIAL PROPERTY
STREET_NUMBER
2944
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17716207
CURRENT_STATUS
02
SITE_LOCATION
2944 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\2944\PR0521334\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. Describe the method that will be utilized to purge andlor inert the tank(s): <br /> Dry Ice will be added to the tank(s) at the rate of 20# per 1000 gal <br /> capacity tor waste oil and dieseltanks and 304 per 1000 gal . Gas. <br /> b. TankMping Hauler. <br /> Name Jim Thorpe OI1 , Inc. <br /> Address P.O. Box 357 city Lodi, CA zip 95241-0357 <br /> Phone No.( 209 ) 368-6175 <br /> Hauler Registration#(ifhauled ashazardous) __ 2667 <br /> C. Tank Piping Disposal Site: Erickson Environmental or Schnitzer Steel products. <br /> Name An appropriate decision will be made at the time of diposal . <br /> ErTeRson Is n HIcEmona, UA, Schnitzer is in Rancho Cordova, CA <br /> Address 12000 Folsom Blvd. , Rancho 6il9rdova, CA Ztp 95742 <br /> Phone Noa 916 ) 985-4810 <br /> EPA m#of transported to a permitted TSD facility) <br /> 9. is the sampling firm an independent third party from the contractor? YES[K NO[] <br /> 9a. Describe,in detall,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> Samples will be taken at least two to three feet under the former tank <br /> location with the backhoe. Soil samples will be taken from the bucket. <br /> Water samples, it necessary, will e taken with a bailer. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal• <br /> Backfill of the excavation will be done at the appriate time during this <br /> project Backfill material will consist of the excavated material and <br /> other clean compactable material. <br /> 11. Handling of excavated soil• <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 3 mil plastic sheeting. <br /> 7�o Ruv� � L,•r•� F/ a!L <br /> b)What will be the final destination of the excavated stockpile? n ■ 004-S <br /> If the stock pile is contaminated, a decision based upon the contaminate , <br /> levels of said contamination and quantities of soil as to the final disposo <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> NameJIm Thorpe Oil , Inc. Hauler Registration# 2667 <br /> Address P.O. Box 357 City LOdi , CA 21p 95241-0357 <br /> PhoneNo.( 209 ) 368-6175 <br /> EH 23 046(Revised 08113199) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.