My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
442
>
2300 - Underground Storage Tank Program
>
PR0231908
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:33 AM
Creation date
11/2/2018 8:27:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231908
PE
2381
FACILITY_ID
FA0003524
FACILITY_NAME
UTSI Tire Service
STREET_NUMBER
442
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
Way
City
Stockton
Zip
95205
APN
15113053
CURRENT_STATUS
02
SITE_LOCATION
442 N Airport Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\442\PR0231908\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICAT,,/ <br />Project Location 442 N. Air Port Way, Stockton, CA 95205 <br />Owner Raymond Lopez Phone No. (029)462-0253 <br />Contractor Jim Thorpe Oil, Inc. Phone Vo. (209)368-6175 License No. 495699 <br />INDICATE 'METHOD OF BACKFILL QUALITY ASSURANCE <br />L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />X 3. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in l'_'' lifts: <br />g A. Pea gravel--imooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rockāse!f-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the baclaill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />1 herebv certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of Five (5) cubic yards per I" gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure comoliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* Jim Thorne-Tn. by Riohnrd Ttc1pe <br />Name I rF-intl <br />* <br />Conty4ctor <br />Title i ^ t <br />Signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.