My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
442
>
2300 - Underground Storage Tank Program
>
PR0231908
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:33 AM
Creation date
11/2/2018 8:27:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231908
PE
2381
FACILITY_ID
FA0003524
FACILITY_NAME
UTSI Tire Service
STREET_NUMBER
442
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
Way
City
Stockton
Zip
95205
APN
15113053
CURRENT_STATUS
02
SITE_LOCATION
442 N Airport Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\442\PR0231908\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a. D ribe the thod that �iH be utlIIzed to pUr�e and/or inert the tank(sl <br />�1e tams will be purged -by inserting dry ice (CO2) at the rate <br />of 30' Per 1,600 grala cnyianity c)rn+ i g d nn <br />per 1,000 gals. capacity for diesel fuel or waste oil tanks. <br />b. Tank;Pipmg Hauler. <br />Name Jim Thorpe Oil, Inc. <br />Address P.O. Bos 357 City Lodi, CA yip 95241-0357 <br />Phone Na! 209 1 368-6175 <br />Hauler Registration # (If hauled as hazardous) 2667 <br />C. Tank,'Piping Disposal Site: <br />Schnitzer Steel Products <br />Address 12000 Folsom Blvd. City Rancho Cordapa., CA 93742 <br />Phone Noi 916 i 98.3-4810 <br />EPA ID# (if transported to a permitted TSD facility) <br />9. Is the sampling firm an Independent third party from the contractor? YES N, NO ( ] <br />9a. Describe, in detall. how the sail and/or water sample(s) beneath the tank and piping will be obtained: <br />Samples will be taken from native soil two to three feet directly <br />under the the former tank location with the backhoe or split on sampler <br />amples will be taken from the backhoe bucket or sampler, W rter samples <br />will be taken with a baller. <br />10. Describe how the excavation will be backfIlled with suitable material upon emovah <br />Backfill operation will done in the appropriate manner depending upon the <br />material being used as fill. <br />il. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />The tank pit and stock Dile will be lined and or enverpH Ivith q to 6 mil <br />plastic sheeting if necessary. <br />b) What will be the final destination of the excavated stockni:e? <br />A decision will be made at the appropriate time. Class 1 disposal will <br />be Chem Waste, Class 2 disposal will be at Forward, Inc. <br />c) Contaminated Soil Hazardous Waste Hauler. <br />Jim Thorpe Oil, Inc. <br />Address P.O. Box 357 <br />Phone No. 209 ! 368-6175 <br />EH 23 046 (Revised 10119198) Page 5 <br />Hauler Registratlon# 2667 <br />Lodi,CA yin 95241-0357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.