Laserfiche WebLink
I%W <br /> 8. a. Describe the method that will be utilized to purge andlor inert the tank(s): <br /> N/A <br /> b. Tar&Plping Hauler. <br /> Name N/A <br /> Address City ZIP <br /> Phone No.( ) <br /> Hauler Registration M(lf hauled as hazardous) <br /> C. TauklPlping Disposal Site: <br /> Name N/A <br /> Address City Zip <br /> Phone No.( ) <br /> N/A <br /> EPA IDM(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES 14 NO[] <br /> 9a. Describe,In detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained <br /> Three holes will be cut in the lube room floor and samples will be <br /> collected with a hand augar at the direction of SJPHS RepreSentitive <br /> at least two feet under the exsisting lines. <br /> 10. Describe how the excavation will be backftiled with suitable material upon removal: <br /> N/A <br /> 11. Handling of excavated soli• <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> N/A <br /> b)What will be the final destination of the excavated stockpile? <br /> N/A <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name N/A Hauler Registration M <br /> Address City ZIP <br /> Phone No. ) <br /> EH 23 046(Revised 10119198) Page 5 <br />