My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
442
>
2300 - Underground Storage Tank Program
>
PR0231908
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:33 AM
Creation date
11/2/2018 8:27:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231908
PE
2381
FACILITY_ID
FA0003524
FACILITY_NAME
UTSI Tire Service
STREET_NUMBER
442
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
Way
City
Stockton
Zip
95205
APN
15113053
CURRENT_STATUS
02
SITE_LOCATION
442 N Airport Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\442\PR0231908\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r,+CKFILL EXCAVATION CERTIFICATE a <br /> Project Location 442 N. Airport Way, Stockton, CA 95205 <br /> Owner Don and Celia Nathe Phone No. (209)943-7134 <br /> Contractor Jim Thorpe Oil , Inc. PhoneNo.(209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> X C. Lines will be filled with 2 sack concrete slurry. <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> . Jim Thorpe Oil , Inc . <br /> Name not <br /> * Presiden <br /> e rt <br /> By <br /> tgnamre <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.