Laserfiche WebLink
MA,R. 23. 2010 12 , 00PM AG SPANOS JET CTR N0. 751 F 2 <br /> F, in.Tank 636Aging I Sift equipment: Ci this box if tank gauging Is used only for Inventory control. <br /> ❑ Check this box it no tank gauging or SIR equipment is lnslall®d. <br /> This section must be completed ff In-tank gagging equipment Is used to perform teak detection monitoring, <br /> Complete the following checklist: <br /> p Yea p No' I Has ail inputwlring been Inspactod for proper entry and tarmination,including testing for ground tault99 <br /> p Yes ❑ No' Were all lank gauging probes visually inspecied for damage and residue buildup? <br /> Yes No, Was accuracy of system product levet readings tested? <br /> ❑ Yes Q No" Was accuracy of system water leual readings tested? <br /> (a Yes ❑ No, Were all probes reinslatlod properly? <br /> ❑ Yes ❑ No' Ware all+lems on the aquipment manufacturer's maintenance chockllsl completed? <br /> Section H,below,describe how and when thDso doflciencles were or will be eorroctsd, <br /> e Leak Detectors(LL li Q C'neck this box if LLDs are not Installed. <br /> Com lets the followingchecklists <br /> ® Yes ❑ No' For equipment start-up or annual equipment certilicatioh, was a leak Simulated to verify LLD performance? (Chuck all that apply) <br /> ❑ ,ylq Simulated leek rate: ®3 g,p.h,; ❑0,1 g.p,h ❑0,2 g.p.h. <br /> ® Yes p NO' Were All Lh(jS Confirmed operationat and accurate within regulatory requirements? <br /> ® Yee No` Was the testing apparatus properly celibreted? <br /> ] Yee ❑ No' For mechanical li does the LLD restnut produce flown it dotacts a leak? <br /> N/A <br /> ❑ Yes ❑ No' For electronic UD9,does the turbine automatically shut off If the LLD detects a leak? <br /> ® NIA <br /> ❑ ves ❑ No" For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system is disabled or disconnected? <br /> 19 N/A <br /> p Yes ❑ No" For electronic Lli does the turbine autor icaiiy shut off if any portion of the monitoring system malfunctions or fails a test? <br /> �C] NIA <br /> ❑ Yes ❑ No` FOr electronic LLds,have all accessible wiring connections been visually inspected? <br /> NIA <br /> ® Yes ❑ No' Were all Items on the equipment manufacturer's maintanance checklist completed? <br /> Section H.holow,describe how and when these deficiencies were or will be corrected, <br /> Coinments <br /> Monitoring system Certification Page 3 of 4 2121107 <br />