Laserfiche WebLink
0 REGEIVEL' <br /> SWRCB,January 2002 Page_of <br /> 11. SPILL/OVERFILL CONTAINMENT BOXES MAR 2 7 2015 <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See comments 5- T _ _ , <br /> Test Method Developed By: ❑Spill Bucket Manufacturer D Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure f1 Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing and recommended ollow-up for failed tests) <br /> *Spill Buckets tested annually,with Monitoring System Certification. <br />