My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing MAR 2 7 <br /> 2015 <br /> Software Version Installed: 17.00 /� <br /> Com late the followin checklist: ''�VI ^ANTA[ <br /> ® Yes ❑ No' Is the audible alarm operational? � <br /> 19 Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sump/Trench <br /> Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks ang sensor failure/disconnection? 0 Yes; ❑No. <br /> ® Yes ❑ No- For tank systems that utilize the monitonng system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ❑ N/A installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger) 90% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No" Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No' I Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. comments: All passed ELENA ON SITE WITH SJV EH <br /> Monitoring System Certification Page 2 of 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.