Laserfiche WebLink
r <br /> UNIFIED PROGRAM CONSOLIDATED FORW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY, 490.2 <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> FACILITY ID#(Agency Use On(y) I. FACILITY INFORMATION <br /> _ I <br /> BUSINESS NAME(Same as FACILITY NAME) 3, <br /> BUSINESS SITE ADDRESS gW60 S ' � „I� � 103. <br /> CITY a C- tom. <br /> II.EQUIPMENT TESTING AND PREV NTIVE MAINTENANCE I4 <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,fine leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is-more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,263$ 2641) <br /> MONITORING EQUIPMENT IS SERVICEDL ANNUALLY El 99.OTHER(Specify): 490-34 <br /> 490-36 <br /> III.MONITORING LOCATIONS <br /> LJ I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN, 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS, (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER:- 490.7. 490-8 <br /> - �� MODEL#: m _ <br /> LEAK SENSOR MANUFACTURER: !` - 440-9. MODEL#(S): 90 iu <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643} 49x1 I <br /> PANEL MANUFACTURER: aso 12. MODEL#; 490-15 <br /> TN-TANK-PROBE MANUFACTURER: -_ 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS �- ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> - ---------------- El d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> ------ -F-y3:---__-- ------- -- --- <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 h. 490-ta <br /> g.p- ❑ c.OTHER S ecif 490-i9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(13 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490`21 <br /> LJ 5.5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify); 490.24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) e90-27 <br /> A1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> S ALARMS. (23 CCR§2636) <br /> --SECONDARY CONTAINMENT IS: a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZ_E_D ❑d.UNDERVACUUM 490-29 <br /> PANEL MANUFACTURER 490.30- ' <br /> ees �'r -moi rODEL _+�5� ago 31 <br /> _L_EAK SENSOR MANUFACTURER: n Oso az 7 ry 490-33 <br /> ����.T � MODEL#(S)�.��Y•.J11-_CJ=OrQ�- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. � ❑it.YES ❑b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOM4kTIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERF. MS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR_§26�_ 49a 36 <br /> -_ MLLD MANUFACTURER(S): o-Kor'L- 490-37 -MO-. DEL#(S): {^ --- 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY,PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) -� 4�0 490-41 <br /> MODEL#(S): <br /> PROGRAMMED IN LINE LEAK TEST:_ ❑ I.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. - 44042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a,YES [I b,NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a,YES ❑L NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 4900-9 - <br /> TESTFRE UENCY ❑ a,ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> 5.VISUAL PIPE MONITORING. <br /> 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY Uf c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> '_Allowed for monitoring of unburied emergency enerator Kiel pipiritordy per HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) '90-52 <br /> 490-51 <br /> UPCF UST-D(12/2007)114 <br />