Laserfiche WebLink
qW UNIFIED PROGRAM CONSOLIDATED FORT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING TRE FOLLOWING METHOD 490-54. <br /> ❑ !.CONTINUOUS ELECTRONIC MONITORING 490-34b <br /> 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS 099.OTHER(Specify): <br /> PANEL MANUFACTURER: _ 490-.55 MODEL#: 490 56. <br /> LEAK SENSOR MANUFA❑`URER; 490-37 MODEL#(S): 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO <br /> ❑ a.YES ❑b.NO 490-60• <br /> FAILURE I DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a YES <br /> ❑ ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS ❑L SINGLE-WALLED ❑2.DOUBLE-WALLED 490-60 <br /> IF DOUBLE WALLED; <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: I.LIQUID 2,PRESSURE 490-648 <br /> �_Q_�__- ❑3,VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65, <br /> LEAK DETECTIdN{ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR 2644.1 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. Q <br /> 490 66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. —� -- -- — <br /> 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> tAlarm logs 490-68. ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> SIR testing results(and supporting documentation records). 490-68a <br /> El Tank gauging results(and supporting documentation retards). ago-fisc <br /> ❑ATG Testing results(and supporting documentation records).49a68f ❑ Corrosion Protection 60-day logs 49o.68g. <br /> quipment maintenance and calibration records. 49afi8h <br /> IX.TRAINING <br /> [3Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their jab duties. 49o-69e <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 49"% <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):m69h,M69t <br /> TrxJ This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> he"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> 9 Names of contact person(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide a ditional comments he a or indicate how many pages with additional infattnalion on specific mon'toring procedures are attached to this plan.49oa1 <br /> �� �- 9v �/O o��. , r 1 <br /> P ft. foe rr 41 C},1 t <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The follo?person(s)are respons' le fpr erforming the monitoring and equipment maint ince: <br /> NAME�� 1 + <br /> 490-72 TITLE J'C C o t1 & C rr' 490-73 <br /> NAME 490.74 TITLE 490.75 <br /> The Designated Operator shall perform a monthly visual inspection of the Facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION.I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT NATURE F <br /> REPRES1 , � �• 7�Q 490-7e DATE: <br /> ip Sof <br /> L490-77 <br /> NT1NG� t.To wngg mnr ncilil wnerld eater 3.AuthorizedRe recenIIU {Ow /,100 <br /> APPLICA T NAME(print): 490.7E <br /> AFPLICANT TITLE: <br /> UPCF UST-D(1212007)314 <br />