Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORWF <br /> ` UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UAC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54. <br /> 131.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY El3.ELECTRONIC STAND-ALONE 490-546 <br /> 4.NO DISPENSERS 099.OTHER(Sped_fir): <br /> PANEL MANUFACTURER: ago=ss MODEL#: 490-5b. <br /> LEAK_SEMSoiMiANUFACTURE <br /> R: 490.171 MODEL 4(S): 490-58 <br /> DETECTION OFA LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES [Ib.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 440"61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490-62 <br /> 2,UDC CONSTRUCTION IS [11.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 4qo(tea <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ I•Ll UID 2_PRESSURE__Q 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-606 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> __LEAK DETECTION(ELD)MUST BE PERFORMED._PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RFt UJRE�23 CCR§2644.1) <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-68n C1Visual Inspection Records 490-68b El Tank integrity testing results 490.68c <br /> SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 49use <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-688 <br /> quipment maintenance and calibration records. 490-69h <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their,job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-6% <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6% <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> rile <br /> facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> Ile"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to time monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide a ditional comments I a or indicate how many pages with additional information on specific mon'toring procedures are attached to this plan.490-n <br /> Ak ibfe_ ,ranit; Vi5i u., ( a_14r v S tAi'f. SA nn 904 <br /> yo 0tie4_ <br /> _(','rJ <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that; 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible rcicase are investigated,and 3)all monitoring records are maintained properly. <br /> The followinperson(s)are respons' le for performing the monitoring and equipment maim anee: / , <br /> NAME��' 490-rz TITLE ul t L'C�O,� —7 O r" � (2 f' 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perfomm a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the ownerloperator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT NATURF r Q 490-76 DATE: c, 490-77 <br /> */�, C)00 <br /> REPRESEKTING: I.Tank 0wu /O em_1or ?. a'tit. wner'D 10r 3.Auth rized Re 'v owner _ <br /> APPLICA T NAME(print); 4190-78 APPLICANT TITLE: 490-79 <br /> UPCF UST-D(12/2007)314 <br />