Laserfiche WebLink
,SWr <br /> RCB, January 20012 • Page ; of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: .- ❑Spill Bucket ManufactuVA& ..-__ ❑Industry Standard ❑Professional Engineer----- <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑-Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Sill Boat# y .. 5p, <br /> Spill ill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: ,- <br /> Wait time between applying <br /> pressure/vacuum/water and ,J <br /> starting test: <br /> Test Start Time: \ <br /> Initial Reading(Rt): <br /> Test End Time: 5� <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in,Reading(RF-R,): <br /> Pass/Fail Threshold or � <br /> Criteria: \ <br /> Test Result: ❑ Pass U Fail ❑ Pass ❑Fail ❑ Pass ❑Pail ❑ Pass ❑FAi\ <br /> Comments—(include information on repairs Madeprior to testing, and recommended ollow-u for ailed tests) <br /> P1 tJ / A-1 <br />