Laserfiche WebLink
l <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN -PAGE I <br /> Mgr. <br /> TYPE OF ACTION E] 1.NEW PLAN 2.CHANGE OF INFORMATION <br /> MOP. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one iteln only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Ilse 17r11v) - <br /> M03. <br /> FACILITY NAME J <br /> N104. CITY + f ✓� Mas. <br /> FACILITY SITE ADDRESS r+ LL <br /> II. EQUIPMENT TESTING AND PRFtVFNTIVE MAINTENANCE <br /> State Saw requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in <br /> Mab. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. Moa <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This mmtitoring plan must include a Site Plan slowing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan fano a Monitoring System Certification <br /> form,hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> M10 <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULTS) <br /> MI I. <br /> SECONDARY CONTAINMENT IS: E�a. RY F1b.LIQUID FILLED E] c.UNDER PRESSURE Eld.UNDEkVACUUM <br /> M12. MODEL#: (� M13. <br /> PANEL MANUFACTURER: V 1P f� t_ <br /> LEAK SENSOR MANUFACTURER• M1a. MODEL#(S): MIs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) I q 3 gj>--ya 0 <br /> M1a, <br /> PANEL MANUFACTURER: M", MODEL#: <br /> MIs. MODEL#(S); M20. <br /> IN-TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: [I a.CONTINUOUS ❑ b.DAILY/NIGHTLY F1 c.WEEKLY Mzo. <br /> El d,MONTHLYe.OTHER(Specify): Met. <br /> M22. M23, <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> ❑ 3.INVENTORY RECONCILIATION [3a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mza. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> hf25 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY El c.OTHER(Specify): Mzb. 11127. <br /> 6.VISUAL MONITORING DONE: K a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> Mzs. <br /> 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M30, <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> IF. 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)rrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT 1S: a.DRY b.LI -UlD FILLED ❑ c.UNDER PRESSURE ❑ d.UND"E-R�,VACUUM <br /> M31. <br /> PANEL MANUFACTURER: Ve 1412- MODEL#: �C./ Mai. <br /> LEAK SENSOR MANUFACTURER: r 1,,114. MODEL#(S): �1 "' <br /> M <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? [ a.YES ❑ b.NO M"'WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? t4a.YES ❑ b.NO Mia' <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETE EDj. r- <br /> MLLD MANUFACTURER(s): e 'k f-Q� M3$ MODEL#(S): M3q, <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TCSTS <br /> ELLD MANUFACTURER: M40. MODEL#: Mal. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTI ILY 0.2 g.p.h. [Ig�P� <br /> b.MINIMUM ANNUAL 0.I h. Maz. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43' <br /> WILL ELLD FAILURE/D[SCONNECTFON'FRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ <br /> a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) MaS. Mab. <br /> [$ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> 1 *Requires agency approval ""Allowed or monitoring of unburied emergency generalar fuel piping onty per HSC§2528t.5(b)(3) <br /> © 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> 1,k48. <br /> ❑ 99.OTI4ER(Specify) <br /> S.ICEHD-d(07103)-1/4 07123103 <br />