Laserfiche WebLink
8 0 <br /> F. In-Tank Gauging!SIR Equipment: x Check this box if tank gauging is used only for inventory control. <br /> I- Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com late the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes �, No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> _! Yes n No* Was accuracy of system product level readings tested? <br /> I Yes ❑ No* Was accuracy of system water level readings tested? <br /> I Yes a No* Were all probes reinstalled properly? <br /> —YesI a No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): —i Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> x Yes J No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> I NIA that apply) Simulated leak rate: x 3 g.p.h.; n 0.1 g.p.h; 11 0.2 g.p.h. <br /> x Yes r! No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes F, No* Was the testing apparatus properly calibrated? <br /> x Yes C No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> u N/A <br /> i Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> x N/A <br /> i Yes o No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> x NIA disconnected? <br /> _i Yes I_ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> x NIA fails a test? <br /> Ll Yes r i No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> x N/A <br /> x Yes L No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: LLD's Tested by Lyle Nimmo of Afford-A-Test,all Passed. <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />