My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> a. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Ll Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure I Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> r. <br /> Piping Run#1 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Poly Plastic <br /> Piping Manufacturer: Environ-Geo Flex <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 6' <br /> Product Stored: Jet A <br /> Method and location of Test boot at STP#1 <br /> piping-run isolation: <br /> Wait time between applying 15 Minutes <br /> -pressure and starting test: <br /> Test Start Time: 2:00 <br /> Initial Reading(R[): 5 Psi <br /> Test End Time: 3:00 <br /> Final Reading(RF): 5 Psi <br /> Test Duration: I Hour <br /> Change in Reading(RF-Ri): 0 Psi <br /> Pass/Fail Threshold or <br /> No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass [] Fail ❑ Pass ❑ Fail D Pass ❑Fail ❑ Pass D Faii <br /> Comments—(include in ormation on repairs made prior to testing, and recommended ollow-u or ailed tests <br /> Piping Run#1,Tested after replacement of Test Seal off Boot at STP Sump#1. Not Tested on original Test Date of 2/4/12. <br /> 5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.